国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽

  • 熱門標(biāo)簽

當(dāng)前位置: 主頁 > 航空資料 > 國外資料 > ICAO >

時間:2010-07-18 19:52來源:藍(lán)天飛行翻譯 作者:admin
曝光臺 注意防騙 網(wǎng)曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費者

c) these operations require the use of elevation guidance below the primary runway minimum glide path.
13.7.5 Runway geometry
13.7.5.1 Figure G-33 shows permitted runway spacings and threshold staggers for the secondary runway. It represents
results for a 3 000 m (10 000 ft) primary runway. The geometrics change marginally with primary runway length. The shaded
area represents results obtained using existing MLS and DME/P (Standard 1) SARPs and the error budget identified in 13.2.
To use Figure G-33, enter the values for secondary runway spacing and threshold stagger. If the resulting point lies within the
shaded area a computed centre line approach to a 60 m (200 ft) DH on a 3-degree elevation is possible.
Note.— The circular region near the 1 200 m runway threshold stagger is due to the upper limit of elevation guidance
used. This region is not expected to present any practical operational limitations.
13.7.6 Extensions to the runway geometries
13.7.6.1 Flight and ground tests have shown that the shaded area can be expanded with the following additional
considerations:
a) an angular expansion is possible by utilizing existing elevation guidance outside the minimum specified azimuth
proportional guidance sector. Elevation guidance for this angular expansion must be verified; and
b) a radial expansion is possible with a slight relaxation of the vertical error budget to 4.9 m (16 ft). This relaxation is
still very conservative and equates to 66 per cent of the equivalent ILS error budget [7 m (24.1 ft)].
ATT G-41 23/11/06
Annex 10 — Aeronautical Communications Volume I
13.7.6.2 An example of the use of Figure G-33 is presented by point A. Using the foregoing expansions, a computed
centre line approach to a secondary runway is possible for a –1 400 m runway spacing and +200 m threshold stagger.
14. Application of Table G-15 service level objectives for MLS/RNAV operations
14.1 MLS/RNAV procedures discussed below can be conducted with ground equipment meeting integrity and
continuity of service objectives identified in Table G-15. Many of these operations may be accomplished with MLS ground
equipment meeting Level 2 objectives only. Further a majority of the procedures may not require positive guidance during
the discontinued approach/missed approach procedure. Where procedural means cannot provide the required obstacle
clearance along an unguided discontinued approach/missed approach, some form of secondary guidance will be required. The
accuracy requirements of the secondary guidance system will be determined by the nature of the obstacle-rich environment.
14.1.1 In those rare cases where an MLS/RNAV procedure is in an obstacle-rich environment, the calculated obstacle
exposure time (OET) may require a higher level of equipment type than that required for landing.
14.1.2 Determination of critical segments
14.1.2.1 The following terms are used to determine the length of the critical segments of an MLS/RNAV procedure.
Obstacle-rich environment. An environment where it is not possible to construct an unguided discontinued
approach/missed approach using procedural means. Secondary guidance will be required to achieve a climb to
minimum sector altitude.
Critical segment. A segment where an unguided discontinued approach/missed approach would expose the aircraft to an
obstacle.
Obstacle exposure time (OET). The time interval required to fly the critical segment of an MLS/RNAV procedure. This
time is used to establish the required level of service of the non-aircraft guidance equipment.
14.1.2.2 In order to determine OET the following procedure can be followed (see Figure G-34):
a) determine if there is an obstacle-rich environment by aligning the unguided discontinued approach/missed approach
surface with any potential heading that may be used during an unguided discontinued approach/missed approach
from the MLS/RNAV procedure;
b) determine whether there is a procedural means for avoiding the obstacle without the need for secondary guidance;
and
c) determine the OET as the period of time during which the obstacle is within the unguided discontinued approach/
missed approach surface, while there is no procedural means for avoiding the obstacle.
14.2 Computed centre line operations
14.2.1 When conducted to the primary runway, these operations require the airborne system to compute lateral
guidance only. Vertical guidance is provided by the elevation function directly. The airborne equipment providing the lateral
guidance must have the same integrity as the MLS receiver is required to have for basic MLS operations being conducted to
an equivalent decision height. Computed centre line operations conducted to a decision height below a Category I decision
height require that the DME have an accuracy, integrity and continuity of service level applicable to the type of operation.
 
中國航空網(wǎng) www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:附件10--航空電信an10_v1_6ed下(145)
国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
国产一区视频观看| 日韩免费毛片| 日本一本中文字幕| 成人av.网址在线网站| 久久亚洲影音av资源网| 欧美极品少妇无套实战| 久久久久久久久久久成人| 亚洲国产另类久久久精品极度 | 国产一区二区三区色淫影院| 久久久com| 亚洲精品国产精品久久| 福利视频一区二区三区四区| 精品免费日产一区一区三区免费| 美女一区视频| 国产精品久久久久免费a∨ | 国产一区二区片| 国产精品麻豆免费版| 狠狠色综合一区二区| 国产精品视频中文字幕91| 欧美高清性xxxxhd| 国产精品免费观看高清| 欧美有码在线视频| 视频一区视频二区国产精品| 日韩精品在线观看av| 久久99精品久久久久久秒播放器 | 欧美精品二区三区四区免费看视频 | 九九热只有这里有精品| 日韩精品免费播放| 深夜福利一区二区| 免费中文日韩| 国产精品高清免费在线观看| 蜜桃成人免费视频| 欧美日本国产在线| 97国产精品免费视频| 亚洲精品中字| 久久99精品国产99久久| 国模精品一区二区三区色天香| 91精品久久久久久久久青青| chinese少妇国语对白| 亚洲伊人成综合成人网| 99一区二区三区| 日韩 欧美 自拍| 久久精品成人欧美大片| 国产中文日韩欧美| 一本大道熟女人妻中文字幕在线| 久久久水蜜桃| 欧美亚洲成人免费| 久久夜精品香蕉| 成人免费福利视频| 日本一区二区三区精品视频 | 久久久久久久久电影| 日本不卡一区| 久久天天躁狠狠躁夜夜躁2014| 99在线视频首页| 热re99久久精品国产99热| 国产精品久久久久久久久久 | 精品国产乱码一区二区三区四区| 91精品在线国产| 欧美自拍视频在线| 欧美激情第三页| 国产极品粉嫩福利姬萌白酱| 狠狠色综合一区二区| 亚洲免费视频播放| 久久久精品国产亚洲| 国产免费色视频| 日本精品一区二区| 久久6免费高清热精品| 久久艹中文字幕| 国产日产欧美视频| 日韩精品久久久| 精品国产乱码久久久久久108| 国产高清精品在线观看| 国产一区二区三区四区五区加勒比| 午夜精品理论片| 久久精品视频亚洲| 国产精品中文在线| 精品人妻一区二区三区四区在线| 亚洲wwwav| 精品国产乱码久久久久久郑州公司| 91精品视频专区| 国产又粗又长又爽视频| 日本成人中文字幕在线| 一区二区三区国| 国产精品乱码视频| 久久精品免费一区二区| 99热成人精品热久久66| 国产一区二区三区高清| 欧美最猛性xxxx| 日日噜噜噜夜夜爽爽| 欧美激情乱人伦一区| 久久精品视频在线| 国产不卡一区二区视频| av在线播放亚洲| 国模精品视频一区二区| 日韩视频在线观看视频| 欧美激情喷水视频| 国产精品久久7| 久久久久久久久久久视频| 91精品国产91久久久久久吃药| 国产区欧美区日韩区| 精品欧美一区免费观看α√| 日韩精品在在线一区二区中文| 性高湖久久久久久久久aaaaa| 国产99在线|中文| 久久伊人91精品综合网站| 国产精品丝袜久久久久久高清| 久久九九视频| 久久综合九色欧美狠狠| 99久久久久国产精品免费| 国产精品伊人日日| 麻豆91蜜桃| 国内精品久久久久久久| 欧美韩国日本在线| 欧美国产亚洲一区| 极品日韩久久| 欧美精品七区| 男人舔女人下面高潮视频| 欧美日韩在线高清| 欧美午夜小视频| 欧美性大战久久久久| 欧美日本亚洲| 黄色一级视频片| 国严精品久久久久久亚洲影视| 欧美日韩dvd| 激情综合在线观看| 欧美综合激情网| 欧美第一黄网| 含羞草久久爱69一区| 精品一区国产| 国产欧美日韩网站| 国产精品夜夜夜一区二区三区尤| 国产精品一区二区欧美黑人喷潮水| 国产日韩欧美视频在线| 成人av中文| 国产精品96久久久久久又黄又硬| 131美女爱做视频| 久久久久久一区| 久久深夜福利免费观看| 国产精品欧美在线| 久久躁狠狠躁夜夜爽| 精品久久精品久久| 亚洲一区二区免费在线| 视频一区视频二区视频| 日本国产中文字幕| 黄色一级片在线看| 国产欧美日韩在线播放| 91精品视频在线| 久久久久久久久久久久久久久久久久av | 北条麻妃一区二区三区中文字幕| 久久久精品国产一区二区| 国产精品久久久久一区二区| 欧美日韩国产91| 日韩一级特黄毛片| 欧美精品久久久| 国产免费一区二区三区视频| 91精品国产高清久久久久久| 久久久久久久91| 欧美精品制服第一页| 午夜精品一区二区三区在线| 日产精品久久久一区二区| 欧美性受xxxx黑人猛交88| 国产女人18毛片| 国产成人亚洲综合无码| 国产精品女主播| 亚洲国产精品久久久久婷婷老年| 日本一区二区视频| 激情五月婷婷六月| 99一区二区三区| 国产成人精品综合| 一区二区在线中文字幕电影视频| 欧美一级淫片播放口| 欧美日韩国产综合在线| 高清视频在线观看一区| 久久久久久久久网站| 国产精品对白刺激久久久| 亚洲va码欧洲m码| 欧美精品自拍视频| 97免费视频观看| 久久九九全国免费精品观看| 美女av一区二区| 日韩网址在线观看| 国产精品一区在线观看| 日韩在线播放av| 亚洲中文字幕无码专区| 欧美日韩性生活片| 91国产精品视频在线| 国产精品久久久久久久久久东京 | 激情视频小说图片| 国产精品av在线播放| 久久久久久久久中文字幕| 欧美极品欧美精品欧美视频| 欧美中文在线免费| 91精品国产91久久久久福利| 欧美成人午夜剧场免费观看| 日韩精品 欧美| 91成人综合网| 欧美理论片在线观看| 欧美一二三区| 国产成人97精品免费看片| 亚洲永久免费观看|