(1)  Test Bleed Air Valve Opening Rate
(a)  Equipment and Materials 1) Gas Turbine Engine Tester - No. 290270-2-1, AlliedSignal, Inc., Airline Services
Division, P.O. Box 52170, Phoenix, AZ 85072-2170
2)  Electrical Cable Assembly - No. 834367-1, AlliedSignal, Inc.
3)  Test Cable Assembly - No. 294110-1, AlliedSignal, Inc. (this is an alternative to
the 834367-1 Electrical Cable Assembly) 4) Adapter Cable Assembly - No. 2024498-1, AlliedSignal, Inc. (this is an alternative to the 834367-1 Electrical Cable Assembly)
(b)  Prepare for Bleed Air Valve Operation Test 1) Position BATTERY switch to OFF and placard. 2) Open APU compartment access door latches and open access door. Install
door support rods. 3) Support shroud, open shroud latches, and remove shroud.
CAUTION:  EXERCISE EXTREME CARE NOT TO DAMAGE SHROUD DRAIN LINES WHEN HANDLING SHROUD.
49-21-01  Apr 01/97
Page 514
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.

(c)  Connect Gas Turbine Engine Tester to Engine 1) Repeat steps 2.A.(3)(a) thru 2.A.(3)(h).
NOTE:  Connecting of control air pressure hose assembly (3) and oil pressure hose assembly is not necessary for this test.
2)  Disconnect the electrical plug (37) from the tachometer generator (36).
3)  Connect the electrical cable or test cable assembly (46) to the tachometer generator (36) and the electrical plug (37).
(d)  Test Bleed Air Valve Opening Rate 1) Perform prestart procedure per par. 2.A.(4). 2) Observe engine operating requirements given in par. 1.D while performing test. 3) APUs WITHOUT ALLIEDSIGNAL SB GTCP85-49-7096; if you must operate the
APU with the lower shroud removed, make sure all persons are not in the hazard area (AMM 49-11-0/201).
WARNING:  DO NOT OPERATE THE APU WITH THE LOWER SHROUD REMOVED IF PERSONS ARE IN OR DIRECTLY BELOW THE APU COMPARTMENT. YOU MUST BE A MINIMUM OF 3 FEET AWAY FROM THE OUTER EDGE OF THE APU COMPARTMENT OPENING TO OPERATE THE APU WITH THE LOWER SHROUD REMOVED. AN APU TURBINE WHEEL SEPARATION DURING OPERATION CAN CAUSE INJURY TO PERSONS.
NOTE:  APUs with AlliedSignal SB GTCP85-49-7096 have an external shield around the turbine plenum and have no hazard area.
4)  On forward overhead panel, position APU master switch to START and release.
NOTE:  If APU master switch is initially positioned to ON and air inlet door fully opens before APU master switch is moved to START, start and stop relay K1 will not be energized and engine will not start.
5) Allow engine to accelerate to governed speed.
6) With no load applied, engine speed should stabilize at 102% rpm (max) as

indicated on indicator (15) (Fig. 502).
7)  On forward overhead panel, position APU BLEED valve switch to ON.
8)  Position air conditioning R PACK and L PACK valve switches to ON. For
complete operation of air conditioning system, Ref Chapter 21, Air Conditioning.
Aug 01/95 49-21-01 Page 515
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.

9)  Position tester load switch (29) to ON.
10)  Measure time from actuation of tester load switch until fuel pressure gage (2) shows first peak reading. This should occur within 12 to 14 seconds, indicating that valve has reached full load position.
11)  Observe engine speed drop on indicator (15) at load application. Speed drop should not exceed 2% engine rpm.
12)  Move air conditioning control cabin temperature selector switches to MANUAL COLD until air mix valves indicate COLD.
13)  Observe engine speed at full bleed load operation on indicator (15). Speed should stabilize at 100% to 98% engine rpm.
14)  Observe engine exhaust gas temperature on indicator (7) at full bleed air load operation. This temperature is load control thermostat controlling temperature and should not exceed 650°C.
15)  Position tester load switch to OFF.
16)  Position air conditioning R PACK and L PACK valve switches to OFF.
17)  Position APU BLEED valve switch to OFF.
18)  Allow engine to operate at no load governed speed for 1 minute (minimum).
19)  Position APU master switch to OFF.
20)  If time limit in step 10) was not met, adjust bleed air valve rate control adjustment screw as follows:
NOTE:  There are two configurations of rate control adjustment screw. Each requires certain precautions when making adjustments.
a)  On airplanes with configuration 1 rate adjusting screw (Fig. 504, View 2).
1.  
Loosen sleeved jamnut on rate control adjustment screw.

2.  
Turn adjustment screw clockwise to increase opening time; turn adjustment screw counterclockwise to decrease opening time.

NOTE:  If adjustment is difficult to make, contamination of needle valve may be problem - remove needle valve, wipe clean and reinstall.
 
中國航空網 www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:737 AMM 飛機維護手冊 機載輔助動力AIRBORNE AUXILIARY POWER(55)

国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
久草一区二区| 日韩中文字幕三区| 国产盗摄视频在线观看| 国产精品久久久久久婷婷天堂 | 逼特逼视频在线| 久久久久欧美| 久久99国产精品自在自在app| 日本视频一区二区在线观看| 青青青在线观看视频| 蜜桃日韩视频| 久久精品国产一区二区三区不卡| 九色91av视频| 日韩精品一区二区三区不卡| 精品视频一区二区| 国产成人亚洲综合青青| 一区二区三区四区视频在线观看| 欧美精品久久久| 国产a级全部精品| 亚洲资源视频| 福利精品视频| 欧美成年人视频网站| 欧美日韩亚洲一区二区三区在线观看| 久久久中精品2020中文| 久久6精品影院| 青青青国产在线视频| 丰满爆乳一区二区三区| 国产精品视频网站在线观看| 日日摸天天爽天天爽视频| 国产精品一区二区免费在线观看| 国产精品嫩草影院一区二区| 欧洲成人在线观看| 久久国产午夜精品理论片最新版本 | 日韩**中文字幕毛片| 国产美女三级视频| 国产精品丝袜久久久久久高清 | 91免费看片网站| 精品久久久久久乱码天堂| 男女猛烈激情xx00免费视频| 色噜噜狠狠色综合网图区| 少妇高潮流白浆| 国产精品在线看| 在线视频91| 国产精品自拍网| 欧美激情喷水视频| 狠狠精品干练久久久无码中文字幕| 99精品国产高清在线观看| 精品中文字幕乱| 国产精品制服诱惑| 欧美wwwxxxx| 国产精品永久免费在线| 欧美精品999| 国产麻豆乱码精品一区二区三区| 国产精品久久久久久免费观看| 欧洲视频一区二区三区| 国产精品999视频| 亚洲国产另类久久久精品极度| 国内精品久久久久久久| 精品国模在线视频| 免费国产一区二区| 国产精品露脸自拍| 日韩免费在线观看视频| 久久韩国免费视频| 国产又粗又猛又爽又黄的网站| 欧美激情视频网址| 成人国产在线看| 亚洲精品不卡| 国产二区一区| 欧美在线不卡区| 国产精品第10页| 国产精品夜夜夜一区二区三区尤| 五月天在线免费视频| 国产成人a亚洲精品| 黑人中文字幕一区二区三区| 91免费国产精品| 亚洲一区二区高清视频| 日日摸日日碰夜夜爽无码| 久久99中文字幕| 欧美精彩一区二区三区| 国产精品免费小视频| 国产日韩在线视频| 色欲色香天天天综合网www| www.日本久久久久com.| 国产在线观看91精品一区| 亚洲精品在线视频观看| 国产精品无码专区在线观看| 成人免费aaa| 欧洲日本亚洲国产区| 美女精品视频一区| 91老司机精品视频| 欧美一级二级三级| 欧美成年人视频网站| 啊v视频在线一区二区三区 | 成人免费在线小视频| 欧美高清视频一区| 性欧美亚洲xxxx乳在线观看| 久操成人在线视频| 国产成人精品最新| 久久亚洲综合网| 国产精品午夜av在线| 国产专区欧美专区| 日本国产中文字幕| 午夜精品理论片| 综合操久久久| 久99九色视频在线观看| 国产精品久久久久久久7电影| 丝袜美腿精品国产二区| 国产高清在线一区二区| 91久久久久久久| 99色这里只有精品| 成人在线小视频| 国产精品一区二区免费| 国产美女精品视频| 精品一区二区国产| 黄色免费视频大全| 欧美二区三区| 欧美综合一区第一页| 欧美一级片一区| 欧美一级特黄aaaaaa在线看片| 亚洲欧洲日夜超级视频| 久久久久国产一区二区三区| 色综合久综合久久综合久鬼88| 国产精品久久999| 国产精品免费久久久久影院 | 久久综合九色99| 91精品国产99久久久久久红楼| yy111111少妇影院日韩夜片| 国产区一区二区三区| 国产片侵犯亲女视频播放| 蜜桃日韩视频| 国产一级不卡视频| 精品婷婷色一区二区三区蜜桃| 国严精品久久久久久亚洲影视 | 国产精品第12页| 欧美美最猛性xxxxxx| 色综合久久久888| 亚洲自拍欧美另类| 欧美一区二区三区免费视| 日韩在线xxx| 日本a视频在线观看| 欧美一区二区影视| 蜜臀久久99精品久久久酒店新书| 欧美极品日韩| 麻豆蜜桃91| 国产欧洲精品视频| 91久久久在线| 国产成人精品免费看在线播放| 久草青青在线观看| 久久精品一区中文字幕| 国产精品福利网| 在线视频一区观看| 五月天色婷婷综合| 日本少妇高潮喷水视频| 欧美激情国产精品日韩| 蜜桃传媒一区二区| 成人福利视频网| 久久精品国产精品国产精品污| 久久99久久精品国产| 久久精品亚洲94久久精品| 精品国产一区二区三区四区vr| 综合国产精品久久久| 日本十八禁视频无遮挡| 欧美日韩精品免费观看视一区二区| 免费拍拍拍网站| 国产精品专区h在线观看| 国产精品99久久久久久人| 国产成人短视频| 国产精品日韩av| 中文字幕欧美日韩一区二区三区| 亚洲av首页在线| 欧美在线视频一区二区三区| 精品无人区一区二区三区| 国产精品一二三在线观看| 久久手机在线视频| 国产精品老牛影院在线观看| 亚洲五月六月| 欧美午夜欧美| 国产伦精品免费视频| 国产成人在线播放| 欧美成人精品一区| 日本一道本久久| 国产区精品在线观看| 久久久久久一区| 亚洲一区不卡在线| 男人亚洲天堂网| 8050国产精品久久久久久| 操人视频在线观看欧美| 日韩不卡av| yy111111少妇影院日韩夜片| 国产精品视频一区二区三区四区五区 | 久久国产精品久久久久久| 日韩五码在线观看| 国产精品一区二区三区不卡| 久久久久一区二区三区| 一区二区精品视频| 免费看污久久久| 久久久久久久久久久成人| 欧美激情区在线播放| 欧美视频第一区| 久久亚洲一区二区| 九九久久综合网站|