(1)  Test Bleed Air Valve Opening Rate
(a)  Equipment and Materials 1) Gas Turbine Engine Tester - No. 290270-2-1, AlliedSignal, Inc., Airline Services
Division, P.O. Box 52170, Phoenix, AZ 85072-2170
2)  Electrical Cable Assembly - No. 834367-1, AlliedSignal, Inc.
3)  Test Cable Assembly - No. 294110-1, AlliedSignal, Inc. (this is an alternative to
the 834367-1 Electrical Cable Assembly) 4) Adapter Cable Assembly - No. 2024498-1, AlliedSignal, Inc. (this is an alternative to the 834367-1 Electrical Cable Assembly)
(b)  Prepare for Bleed Air Valve Operation Test 1) Position BATTERY switch to OFF and placard. 2) Open APU compartment access door latches and open access door. Install
door support rods. 3) Support shroud, open shroud latches, and remove shroud.
CAUTION:  EXERCISE EXTREME CARE NOT TO DAMAGE SHROUD DRAIN LINES WHEN HANDLING SHROUD.
49-21-01  Apr 01/97
Page 514
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.

(c)  Connect Gas Turbine Engine Tester to Engine 1) Repeat steps 2.A.(3)(a) thru 2.A.(3)(h).
NOTE:  Connecting of control air pressure hose assembly (3) and oil pressure hose assembly is not necessary for this test.
2)  Disconnect the electrical plug (37) from the tachometer generator (36).
3)  Connect the electrical cable or test cable assembly (46) to the tachometer generator (36) and the electrical plug (37).
(d)  Test Bleed Air Valve Opening Rate 1) Perform prestart procedure per par. 2.A.(4). 2) Observe engine operating requirements given in par. 1.D while performing test. 3) APUs WITHOUT ALLIEDSIGNAL SB GTCP85-49-7096; if you must operate the
APU with the lower shroud removed, make sure all persons are not in the hazard area (AMM 49-11-0/201).
WARNING:  DO NOT OPERATE THE APU WITH THE LOWER SHROUD REMOVED IF PERSONS ARE IN OR DIRECTLY BELOW THE APU COMPARTMENT. YOU MUST BE A MINIMUM OF 3 FEET AWAY FROM THE OUTER EDGE OF THE APU COMPARTMENT OPENING TO OPERATE THE APU WITH THE LOWER SHROUD REMOVED. AN APU TURBINE WHEEL SEPARATION DURING OPERATION CAN CAUSE INJURY TO PERSONS.
NOTE:  APUs with AlliedSignal SB GTCP85-49-7096 have an external shield around the turbine plenum and have no hazard area.
4)  On forward overhead panel, position APU master switch to START and release.
NOTE:  If APU master switch is initially positioned to ON and air inlet door fully opens before APU master switch is moved to START, start and stop relay K1 will not be energized and engine will not start.
5) Allow engine to accelerate to governed speed.
6) With no load applied, engine speed should stabilize at 102% rpm (max) as

indicated on indicator (15) (Fig. 502).
7)  On forward overhead panel, position APU BLEED valve switch to ON.
8)  Position air conditioning R PACK and L PACK valve switches to ON. For
complete operation of air conditioning system, Ref Chapter 21, Air Conditioning.
Aug 01/95 49-21-01 Page 515
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.

9)  Position tester load switch (29) to ON.
10)  Measure time from actuation of tester load switch until fuel pressure gage (2) shows first peak reading. This should occur within 12 to 14 seconds, indicating that valve has reached full load position.
11)  Observe engine speed drop on indicator (15) at load application. Speed drop should not exceed 2% engine rpm.
12)  Move air conditioning control cabin temperature selector switches to MANUAL COLD until air mix valves indicate COLD.
13)  Observe engine speed at full bleed load operation on indicator (15). Speed should stabilize at 100% to 98% engine rpm.
14)  Observe engine exhaust gas temperature on indicator (7) at full bleed air load operation. This temperature is load control thermostat controlling temperature and should not exceed 650°C.
15)  Position tester load switch to OFF.
16)  Position air conditioning R PACK and L PACK valve switches to OFF.
17)  Position APU BLEED valve switch to OFF.
18)  Allow engine to operate at no load governed speed for 1 minute (minimum).
19)  Position APU master switch to OFF.
20)  If time limit in step 10) was not met, adjust bleed air valve rate control adjustment screw as follows:
NOTE:  There are two configurations of rate control adjustment screw. Each requires certain precautions when making adjustments.
a)  On airplanes with configuration 1 rate adjusting screw (Fig. 504, View 2).
1.  
Loosen sleeved jamnut on rate control adjustment screw.

2.  
Turn adjustment screw clockwise to increase opening time; turn adjustment screw counterclockwise to decrease opening time.

NOTE:  If adjustment is difficult to make, contamination of needle valve may be problem - remove needle valve, wipe clean and reinstall.
 
中國航空網 www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:737 AMM 飛機維護手冊 機載輔助動力AIRBORNE AUXILIARY POWER(55)

国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
国产一区亚洲二区三区| 日本一区免费看| 国产99视频在线观看| 天堂v在线视频| 国产嫩草一区二区三区在线观看| 日韩色av导航| 日韩国产高清一区| 国产极品尤物在线| 亚洲一区二区久久久久久久| 国产美女久久久| 国产精品后入内射日本在线观看| 日韩免费一级视频| 国产suv精品一区二区| 亚洲精品一品区二品区三品区| 国产区精品视频| 国产精品久久亚洲| 国内精品久久久久| 国产精品成人aaaaa网站| 欧美亚洲另类久久综合| 国产成人精品久久二区二区| 亚洲第一在线综合在线| 91精品国产91久久久久麻豆 主演| 欧美日韩国产成人| 国产精品一区在线免费观看| 精品国产乱码久久久久久郑州公司| 国内精品久久久久久影视8| 国产精品久久久久久影视| 男人添女人下部高潮视频在观看| 精品国产一区二区三区久久狼5月| 日韩免费电影一区二区三区| 久久久久久亚洲精品中文字幕| 日本久久久久久久久| 九九九九九精品| 欧美一区国产一区| 日韩有码在线观看| 狠狠97人人婷婷五月| 国产精品极品在线| 国产系列第一页| 在线免费观看一区二区三区| 91免费看国产| 日韩中文字幕免费在线| 久久久久人妻精品一区三寸| 欧美日本国产精品| 国产精品久久久久77777| 国产一区二中文字幕在线看| 一区二区精品视频| 国产福利精品在线| 欧美日韩在线高清| 久久99精品国产99久久6尤物| 国产小视频免费| 亚洲精品日韩精品| 久久久久久久久久久久久久久久av | 日韩精品一区在线视频| 国产精品视频网址| 国产精品一国产精品最新章节| 亚洲精品影院| 国产精品少妇在线视频| 国产欧美精品aaaaaa片| 天天综合狠狠精品| 国产精品欧美在线| av片在线免费| 欧美性大战久久久久xxx| 中文字幕色呦呦| 久久99久久99精品| 国产一区二区高清不卡| 日本一区精品| 久久成人人人人精品欧| 国产经典一区二区三区| 国内精品在线观看视频| 亚洲精品一区二| 国产精品久久999| 久久综合毛片| 精品1区2区| 日韩一级片免费视频| 国产精品嫩草视频| 久久偷窥视频| 国产区一区二区| 欧美亚洲视频在线看网址| 欧美极品欧美精品欧美视频| 久久久久久久激情| www.av中文字幕| 免费观看美女裸体网站| 日韩av一级大片| 欧美成人在线免费| 日韩中文第一页| 91久久中文字幕| 国产视频一视频二| 日韩av不卡电影| 最新av在线免费观看| 久久综合伊人77777尤物| 成人国产精品久久久| 欧美精品亚洲精品| 日韩av电影中文字幕| 欧美激情亚洲自拍| 国产精品老女人精品视频| 国产成人aa精品一区在线播放| 国产女人精品视频| 青青久久av北条麻妃黑人| 亚洲欧美日韩不卡一区二区三区| 国产精品久久久久久久7电影| 久草视频国产在线| 91精品国产高清自在线看超| 国产日韩av在线| 国内久久久精品| 欧美精品一区免费| 人妻熟女一二三区夜夜爱 | 国产精品成人一区二区三区 | 久久躁狠狠躁夜夜爽| 色妞久久福利网| 国产激情综合五月久久| 国产精品综合网站| 国产无套内射久久久国产| 好吊色欧美一区二区三区| 日韩精品福利视频| 日本视频精品一区| 日本最新高清不卡中文字幕 | 久久一区二区三区av| 成人动漫在线观看视频| 国产啪精品视频| 国产日产欧美精品| 国产区一区二区| 国产区欧美区日韩区| 国产日韩精品入口| 国产主播精品在线| 国产综合免费视频| 免费观看亚洲视频| 麻豆av一区二区| 国产又粗又爽又黄的视频| 激情久久av| 黄色一级片av| 国内精品模特av私拍在线观看| 欧美日韩一区二区三区在线观看免 | 欧美精品成人网| 精品人伦一区二区三区| 欧美日韩午夜爽爽| 免费在线a视频| 免费看污久久久| 国产欧美一区二区白浆黑人 | 日韩亚洲精品视频| 国产精品丝袜久久久久久高清| 日韩在线视频导航| 国产精品视频网址| 美女视频久久黄| 亚洲人体一区| 日韩高清专区| 男人的天堂99| 国产女精品视频网站免费| 成人av在线亚洲| 91精品国产91久久久久麻豆 主演| 久久男人资源站| 久久精彩免费视频| 国产精品吹潮在线观看| 美女久久久久久久久久久| 一区二区在线中文字幕电影视频| 一区二区三区四区欧美| 污污污污污污www网站免费| 日韩欧美在线免费观看视频| 激情视频小说图片| www.国产二区| www.欧美三级电影.com| 精品国产一区二区三区在线| 亚洲欧洲精品在线| 日韩女在线观看| 女同一区二区| 国产精品一区久久| 久久人人九九| 国产精品啪啪啪视频| 一区二区不卡在线视频 午夜欧美不卡' | 久久www视频| 久久综合免费视频| 亚洲v日韩v综合v精品v| 欧洲久久久久久| 国产日韩在线免费| 国产高潮呻吟久久久| 久久av资源网站| 色综合久久av| 精品一区二区不卡| 国产经品一区二区| 国产精品第157页| 日产中文字幕在线精品一区| 国产视频一视频二| 久久久久久久免费视频| 免费91麻豆精品国产自产在线观看| 午夜精品久久久久久久男人的天堂| 欧美亚洲国产精品| julia一区二区中文久久94| 久久精品国产亚洲精品| 亚洲综合国产精品| 欧美精品卡一卡二| 久久久亚洲欧洲日产国码aⅴ| 久久精品久久久久久国产 免费| 中文字幕av日韩精品| 欧美性大战久久久久| 91精品国产乱码久久久久久蜜臀| 国产精品嫩草视频| 日本午夜一区二区三区| 福利视频一二区| 国产精品欧美风情| 日韩久久不卡| 97精品视频在线播放|