国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽

  • 熱門標簽

當前位置: 主頁 > 航空資料 > 機務資料 >

時間:2011-03-30 15:04來源:藍天飛行翻譯 作者:航空
曝光臺 注意防騙 網曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費者

*[2]  Chrome plate to maximum thickness of 0.010. Machine to design limits with 32 micorinch finish.
*[3]  Clearance determined by subtracting Teflon ball bearing from steel housing. Replace the Teflon bearing when the wear exceeds 0.0005.
*[4]  Refer to overhaul manual for replacement instructions.
*[5]  Drill oversize hole 1.186 maximum in-pin. Manufacture oversize bushing having 0.0005 to 0.0025 interference fit and press in place.
501  Main Gear Actuator Assembly Wear Limits 
Feb 20/94  Figure 601 (Sheet 4)  32-32-11 
Page 605 
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details. 


MAIN GEAR UPLOCK MECHANISM - REMOVAL/INSTALLATION
1.  General
A.  Complete removal of main gear lock mechanism is extremely unlikely. The following instructions describe complete removal and installation of lock mechanism. When only part removal is required, follow directions under appropriate headings. The uplock hook and the link assembly must be removed before the uplock crank can be removed. The uplock crank must be installed before the hook and the link.
2.  Prepare to Remove Main Gear Lock Mechanism
A.  Check that landing gear ground lockpins are installed in all gear.
B.  Depressurize hydraulic system A.
C.  Open all landing gear circuit breakers on panel P-6.
D.  Jack airplane until weight is supported on jacks (Ref Chapter 7, Jacking Airplane).
E.  Remove uplock sensor and mounting bracket (Ref 32-61-21) from uplock hook. Tie sensor out of way
3.  Removal/Installation Main Gear Lock Mechanism
A.  Remove Uplock Hook
(1)  
Remove lockwire, drive out spring pins (16, Fig. 401) securing uplock springs (14) to upper spring shaft (19).

(2)  
Tap out shaft (19) from hook to release springs (14). Preserve spacers (18) that drop free when shaft comes out.

(3)  
Remove bolt (21) securing hook (15) to stop link (20).

(4)  
Remove hook to uplock crank attachment bolt (13) and remove hook (15) from airplane.

(5)  
Remove nut from uplock support shaft (5).

(6)  
Tap out shaft (5). Retrieve crank retaining collar (3) as shaft comes out.

NOTE:  Position, number, and size of shims (6) installed under shaft head and between uplock crank (4) and uplock support fitting (8) should be tagged for use during assembly.

(7)  
Remove uplock mechanism (4) from airplane.


500 
May 01/03  BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  32-32-31 Page 401 


B.  Install Main Gear Uplock Mechanism (Fig. 401)
WARNING:  USE NITRILE GLOVES FOR SKIN PROTECTION AGAINST BMS 3-27 (MASTINOX 6856K). IF MASTINOX GETS ON YOUR SKIN, IMMEDIATELY REMOVE IT WITH WATER. IF THIS MATERIAL GETS IN YOUR EYES, IMMEDIATELY FLUSH YOUR EYES WITH WATER AND GET MEDICAL AID. THIS MATERIAL CONTAINS VERY POISONOUS AND FLAMMABLE AGENTS WHICH CAN CAUSE INJURIES TO PERSONS.
CAUTION:  UNWANTED MASTINOX MUST BE REMOVED FROM SURFACES WHICH WILL BE GREASED. APPLICATION OF MASTINOX TO JOINTS THAT TURN COULD CAUSE FAILURE OF THE LANDING GEAR TO EXTEND OR RETRACT.
NOTE: 1. Parts which are not lubricated after installation must be coated with Mastinox 6856K.
2.  Parts which are lubricated after installation must be lubricated with Aero Shell 07.
(1)  
Place uplock mechanism in position in reaction link (24).

(2)  
Install attachment bolt (23) with head to antirotation lug on reaction link.

(3)  
Add washer and nut.

(4)  
Turn the nut on the bolt until the self-locking threads are fully engaged but the nut is not seated.

(5)  
Measure the torque, and make sure that the torque is 90-800 pound-inches (This is the run-on torque).

(6)  
Tighten the nut to the run-on torque plus 250-300 pound-inches.

(7)  
Install uplock support shaft (5) through side strut support frame (7).


NOTE:  Position, number, and size of shims should be installed as tagged on disassembly. If new shims are installed, assemble three thick (0.06-inch) shims
(6) between uplock crank (4) and side strut support frame (7). Shim with chamfer must be installed with chamfer against head of pin.
(8)  
Pass shaft through uplock crank (4), place uplock crank retaining collar (3) on shaft, and insert narrow end of shaft (5) through support fitting (8).

(a)  Align collar slot with bellcrank rib and engage rib into slot.

(9)  
Install collar bolt (2) through crank retaining collar (3) and shaft (5). Insert bolt from side with counter bore.

(10)
Position shims on either side of side strut support frame (7) to center uplock hook on uplock roller within + 0.10 inch. Do a check on the clearance between the shims (6), and the support frame (7) on each side of the support frame (7). Add the clearance that you get on each side of the support frame (7).
 
中國航空網 www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:737 AMM 飛機維護手冊 起落架 LANDING GEAR(90)

国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
欧美精品一区三区| 日产精品久久久一区二区| 国产欧美日韩综合精品二区| 欧美亚洲午夜视频在线观看| 日韩美女在线观看| 日韩精品电影网站| 青青青青在线视频| 欧美亚洲国产另类| 免费看日b视频| 国产资源在线免费观看| 国产又大又硬又粗| 国产精品中文字幕在线| 波多野结衣久草一区| 91免费欧美精品| 成人av一级片| …久久精品99久久香蕉国产| 91国在线高清视频| 国产成人精品视频ⅴa片软件竹菊| 国产黄色一级网站| 国产精品视频成人| 精品国产乱码久久久久久丨区2区 精品国产乱码久久久久久郑州公司 | 欧美激情第1页| 欧美激情一区二区三级高清视频| 一区不卡字幕| 奇米精品一区二区三区| 精品人妻大屁股白浆无码| 国产一级黄色录像片| 99久久99久久精品| 日韩中文字幕av| 不卡av电影院| 亚洲高清视频一区二区| 日韩精品手机在线观看| 免费高清在线观看免费| 成年丰满熟妇午夜免费视频| 国产成人精品免高潮在线观看| 久久久久久久久久久久久国产| 国产精品美女午夜av| 欧美精品xxx| 日韩中文不卡| 国产在线一区二区三区欧美| 91久久久久久久久| 国产精品视频久| 亚洲欧洲日韩精品| 欧美两根一起进3p做受视频| 成人h视频在线观看| www.欧美精品| 伊人久久大香线蕉午夜av| 青青在线视频观看| 国产精品一区二区三区在线| 国产suv精品一区二区三区88区| 久久久国产精彩视频美女艺术照福利| 国产精品成人免费电影| 午夜免费电影一区在线观看| 免费在线黄网站| 97久久精品午夜一区二区| 国产精品视频一区二区三区四| 亚洲区一区二区三区| 国模杨依粉嫩蝴蝶150p| 久久99影院| 亚洲综合色av| 国产综合在线观看视频| 久久精品网站视频| 一本久道久久综合| 精品欧美日韩| 久久久久久久久久国产精品| 久久久久久999| 精品视频在线观看| 日韩中文字幕国产| 日本在线观看一区二区| 99高清视频有精品视频| 久久中国妇女中文字幕| 欧美在线一二三区| 国产高清在线一区二区| 午夜精品一区二区在线观看的| 国产日韩欧美日韩| 国产精品久久久久久久久久尿 | 国产伦视频一区二区三区| 国产精品偷伦免费视频观看的| 日本a在线免费观看| 99超碰麻豆| 中文字幕精品一区日韩| 蜜桃91精品入口| 按摩亚洲人久久| 日本成人精品在线| 国产成人aa精品一区在线播放| 亚洲一区三区电影在线观看| 国产精品一国产精品最新章节| 国产精品成人av在线| 免费国产成人看片在线| 国产精品欧美日韩一区二区| 日韩欧美精品一区二区三区经典| 久久久免费看| 少妇一晚三次一区二区三区| 久久久水蜜桃| 日本在线高清视频一区| 国产成人avxxxxx在线看| 日本精品久久电影| 国产二区不卡| 日韩欧美精品在线观看视频| 深夜福利一区二区| 欧美连裤袜在线视频| 国产精品日本精品| 国产日产精品一区二区三区四区| 精品免费久久久久久久| 国产精品一区二区三区四区五区| 久久久久久国产精品美女| 99久热re在线精品996热视频| 亚洲 欧美 日韩 国产综合 在线| 国产精品com| 日本精品久久久久影院| 国产精品视频一区二区三区经| 国产一级片黄色| 亚洲日本精品国产第一区| 久久青青草原| 久久久久久艹| 欧美精品久久久久久久自慰| 欧美xxxx综合视频| 99爱视频在线| 青青久久av北条麻妃黑人| 国产精品久久久久久久美男| 国产精品一区二区久久精品| 日韩资源av在线| 国产精品免费视频久久久| 国产欧美一区二区三区不卡高清| 亚洲三区在线观看| www.日韩视频| 国产伦精品一区二区三区精品视频 | 国产精品自拍网| 午夜精品一区二区三区视频免费看| 成人国产精品av| 日本免费在线精品| 国产精品久久久久久网站| 国产欧美日本在线| 日本福利视频一区| 久久国产精品免费视频| 91国产在线免费观看| 欧美乱偷一区二区三区在线| 这里只有精品66| www国产精品视频| 成年人网站国产| 欧美高清视频一区| 午夜在线视频免费观看| 国产精品久久国产三级国电话系列| 91精品国产综合久久香蕉最新版 | 久久久久久12| 精品国产一区二区三区久久狼黑人 | 久久精品亚洲94久久精品| 成人免费a级片| 欧日韩免费视频| 伊人久久大香线蕉成人综合网| 久久久欧美精品| 国产美女搞久久| 热久久这里只有| 欧美激情欧美激情在线五月| 日韩有码在线电影| 91精品国产高清久久久久久久久| 欧美久久久久久久久久久久久久 | 国产精品国产自产拍高清av水多| 国产精品久久中文字幕| 91精品国产综合久久久久久丝袜| 欧美极品一区| 无码人妻丰满熟妇区96| 一区二区三区四区不卡| 久久精品久久久久| 久久艳妇乳肉豪妇荡乳av| 隔壁老王国产在线精品| 黄色录像特级片| 国产尤物99| 欧美伊久线香蕉线新在线| 欧美一级黄色影院| 中文字幕制服丝袜在线| 欧美精品一区二区免费| 国产精品视频一区二区三区四| 久久国产成人精品国产成人亚洲| 91精品国产91久久久久久不卡| 国产剧情日韩欧美| 国产一区二区四区| 蜜桃传媒一区二区三区| 欧美日韩亚洲一区二区三区四区| 日韩少妇内射免费播放| 日韩aⅴ视频一区二区三区| 午夜啪啪免费视频| 伊人久久大香线蕉av一区| 欧美成人第一页| 久久亚洲精品一区二区| 国产精品裸体瑜伽视频| 国产精品久久久久久网站| 国产精品乱码视频| 国产精品高潮呻吟久久av无限| 国产精品视频导航| 国产精品三级网站| 国产精品久久久久久久9999 | 久久久久久久少妇| 久久久成人精品一区二区三区| 91精品国产高清久久久久久久久| 99精品国产一区二区| 成人免费观看cn| aaa级精品久久久国产片| 99福利在线观看| 久久五月天婷婷|