*[2]  Chrome plate to maximum thickness of 0.010. Machine to design limits with 32 micorinch finish.
*[3]  Clearance determined by subtracting Teflon ball bearing from steel housing. Replace the Teflon bearing when the wear exceeds 0.0005.
*[4]  Refer to overhaul manual for replacement instructions.
*[5]  Drill oversize hole 1.186 maximum in-pin. Manufacture oversize bushing having 0.0005 to 0.0025 interference fit and press in place.
501  Main Gear Actuator Assembly Wear Limits 
Feb 20/94  Figure 601 (Sheet 4)  32-32-11 
Page 605 
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details. 


MAIN GEAR UPLOCK MECHANISM - REMOVAL/INSTALLATION
1.  General
A.  Complete removal of main gear lock mechanism is extremely unlikely. The following instructions describe complete removal and installation of lock mechanism. When only part removal is required, follow directions under appropriate headings. The uplock hook and the link assembly must be removed before the uplock crank can be removed. The uplock crank must be installed before the hook and the link.
2.  Prepare to Remove Main Gear Lock Mechanism
A.  Check that landing gear ground lockpins are installed in all gear.
B.  Depressurize hydraulic system A.
C.  Open all landing gear circuit breakers on panel P-6.
D.  Jack airplane until weight is supported on jacks (Ref Chapter 7, Jacking Airplane).
E.  Remove uplock sensor and mounting bracket (Ref 32-61-21) from uplock hook. Tie sensor out of way
3.  Removal/Installation Main Gear Lock Mechanism
A.  Remove Uplock Hook
(1)  
Remove lockwire, drive out spring pins (16, Fig. 401) securing uplock springs (14) to upper spring shaft (19).

(2)  
Tap out shaft (19) from hook to release springs (14). Preserve spacers (18) that drop free when shaft comes out.

(3)  
Remove bolt (21) securing hook (15) to stop link (20).

(4)  
Remove hook to uplock crank attachment bolt (13) and remove hook (15) from airplane.

(5)  
Remove nut from uplock support shaft (5).

(6)  
Tap out shaft (5). Retrieve crank retaining collar (3) as shaft comes out.

NOTE:  Position, number, and size of shims (6) installed under shaft head and between uplock crank (4) and uplock support fitting (8) should be tagged for use during assembly.

(7)  
Remove uplock mechanism (4) from airplane.


500 
May 01/03  BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  32-32-31 Page 401 


B.  Install Main Gear Uplock Mechanism (Fig. 401)
WARNING:  USE NITRILE GLOVES FOR SKIN PROTECTION AGAINST BMS 3-27 (MASTINOX 6856K). IF MASTINOX GETS ON YOUR SKIN, IMMEDIATELY REMOVE IT WITH WATER. IF THIS MATERIAL GETS IN YOUR EYES, IMMEDIATELY FLUSH YOUR EYES WITH WATER AND GET MEDICAL AID. THIS MATERIAL CONTAINS VERY POISONOUS AND FLAMMABLE AGENTS WHICH CAN CAUSE INJURIES TO PERSONS.
CAUTION:  UNWANTED MASTINOX MUST BE REMOVED FROM SURFACES WHICH WILL BE GREASED. APPLICATION OF MASTINOX TO JOINTS THAT TURN COULD CAUSE FAILURE OF THE LANDING GEAR TO EXTEND OR RETRACT.
NOTE: 1. Parts which are not lubricated after installation must be coated with Mastinox 6856K.
2.  Parts which are lubricated after installation must be lubricated with Aero Shell 07.
(1)  
Place uplock mechanism in position in reaction link (24).

(2)  
Install attachment bolt (23) with head to antirotation lug on reaction link.

(3)  
Add washer and nut.

(4)  
Turn the nut on the bolt until the self-locking threads are fully engaged but the nut is not seated.

(5)  
Measure the torque, and make sure that the torque is 90-800 pound-inches (This is the run-on torque).

(6)  
Tighten the nut to the run-on torque plus 250-300 pound-inches.

(7)  
Install uplock support shaft (5) through side strut support frame (7).


NOTE:  Position, number, and size of shims should be installed as tagged on disassembly. If new shims are installed, assemble three thick (0.06-inch) shims
(6) between uplock crank (4) and side strut support frame (7). Shim with chamfer must be installed with chamfer against head of pin.
(8)  
Pass shaft through uplock crank (4), place uplock crank retaining collar (3) on shaft, and insert narrow end of shaft (5) through support fitting (8).

(a)  Align collar slot with bellcrank rib and engage rib into slot.

(9)  
Install collar bolt (2) through crank retaining collar (3) and shaft (5). Insert bolt from side with counter bore.

(10)
Position shims on either side of side strut support frame (7) to center uplock hook on uplock roller within + 0.10 inch. Do a check on the clearance between the shims (6), and the support frame (7) on each side of the support frame (7). Add the clearance that you get on each side of the support frame (7).
 
中國航空網(wǎng) www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:737 AMM 飛機維護手冊 起落架 LANDING GEAR(90)

国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
国产区欧美区日韩区| 欧美xxxx14xxxxx性爽| 久久久久久久久久久亚洲| 日韩有码免费视频| 日韩中文字幕在线看| 欧美精品一区二区三区三州 | 欧美激情小视频| 国产精品亚洲激情| 春色成人在线视频| 精品国产欧美一区二区五十路| 欧美凹凸一区二区三区视频| 国产精品久久久久久影视| 黄色一级二级三级| 欧美激情a∨在线视频播放| 91精品在线播放| 热99精品只有里视频精品| 国产精品久久久久久久久久ktv| 国产欧亚日韩视频| 亚洲 自拍 另类小说综合图区| 久久久久久久久久久久久9999| 黄色一级在线视频| 亚洲综合色av| 日韩视频在线免费| 国产伦精品一区二区三区视频孕妇 | 久久久久久69| 久久99精品国产一区二区三区| 经典三级在线视频| 亚洲在线色站| 日韩在线观看免费高清| 国产日韩欧美在线看| 日韩一级片免费视频| 国产精品老牛影院在线观看| 成人在线一区二区| 日本亚洲欧美三级| 久久成人免费视频| 国产h视频在线播放| 麻豆av福利av久久av| 五月婷婷一区| 国产精品成人一区二区三区| 91精品国自产在线观看| 欧美日本国产精品| 中文字幕无码不卡免费视频| 久久久久99精品久久久久| 国产精品永久免费视频| 欧美重口乱码一区二区| 亚洲中文字幕无码av永久| 久久黄色av网站| 97精品免费视频| 日本久久中文字幕| 九九热这里只有精品6| 久久精品日产第一区二区三区精品版 | 国产精品第一页在线| 欧美日韩dvd| 日本三级中文字幕在线观看| 国产精品国内视频| 久久99欧美| 亚洲日本精品国产第一区| 伊人天天久久大香线蕉av色| 中国人体摄影一区二区三区| 精品国产免费人成电影在线观... 精品国产免费一区二区三区 | 中文字幕在线乱| 欧美精品成人在线| 一区二区三区在线观看www| 欧美日本亚洲视频| 中文字幕久久一区| 亚洲视频导航| 无码内射中文字幕岛国片| 亚洲自偷自拍熟女另类| 中文字幕制服丝袜在线| 亚洲欧洲一二三| 亚洲第一在线综合在线| 日本天堂免费a| 人妻久久久一区二区三区| 欧美一级爱爱视频| 欧美国产综合在线| 蜜桃久久影院| 成人精品在线观看| 91精品国产91| 久久国产乱子伦免费精品| 国产成人久久久精品一区| 国产精品久久网| 久久99国产精品自在自在app| 久久福利视频导航| 一区二区三区的久久的视频| 性欧美激情精品| 日韩精品电影网站| 欧美国产亚洲一区| 国产欧美日韩网站| 91国视频在线| 久久久精品视频成人| 伊人久久在线观看| 亚洲一区免费看| 亚洲激情一区二区三区| 亚洲国产日韩欧美| 天天干天天色天天爽| 色狠狠久久av五月综合| 丁香六月激情婷婷| 亚洲精品免费在线视频| 亚洲精品天堂成人片av在线播放| 91精品国产综合久久男男| 91精品国产综合久久久久久蜜臀 | 国产欧美精品一区二区三区-老狼| 精品一区二区三区国产| 国产在线xxxx| 国产精品一区专区欧美日韩| 国产精品一级久久久| av动漫在线播放| 91九色在线观看视频| 久久亚洲精品欧美| 日韩在线视频网站| 国产精品手机视频| 超碰日本道色综合久久综合| 国产a∨精品一区二区三区不卡 | 国产欧美一区二区三区不卡高清| 高清亚洲成在人网站天堂| 97久久精品国产| 国产不卡一区二区视频| 日韩中文娱乐网| 国产精品久久成人免费观看| 精品国产综合| 亚洲欧洲三级| 久久综合久久综合这里只有精品| www.日韩不卡电影av| 亚洲天堂av免费在线观看| 日韩精品一区二区三区不卡| 国产伦精品一区二区三区四区视频_ | 国产精品一区二区三区免费视频 | 久久久久久久久久国产| 国产精品精品软件视频| 无码人妻精品一区二区蜜桃百度| 狠狠爱一区二区三区| 久久久免费看| 久久香蕉频线观| 日韩在线播放一区| 久久国产一区| 精品不卡一区二区三区| 丁香六月激情网| 蜜桃麻豆www久久国产精品| 成人久久18免费网站漫画| 日韩一级黄色av| 精品国产一区二区三| 日本在线视频www色| 免费毛片网站在线观看| 超碰免费在线公开| 久久久影视精品| 国产精品美女久久| 五月天亚洲综合情| 免费av网址在线| 久久青青草综合| 国产精品久久久久久久免费大片 | 久久99欧美| 免费av在线一区| 日韩精品第1页| 国产精品一二三在线观看| 国产精品10p综合二区| 国产精品久久久久一区二区| 午夜精品久久久久久久99热浪潮 | 日韩一二三在线视频播| 日韩av成人在线| 99在线国产| 中文字幕成人一区| 国产视频精品网| 国产精品久久久久久久久久三级 | 久久久久人妻精品一区三寸 | 日日噜噜噜夜夜爽亚洲精品| 91精品国产免费久久久久久| 99精品在线免费视频| 久久久精品一区二区| 日韩av大全| www.中文字幕在线| 久久av.com| 欧美在线播放cccc| 国产高清精品一区二区三区| 久久91精品国产| 日韩欧美精品在线观看视频| 粉嫩av免费一区二区三区| 国产精品久久一区主播| 日韩欧美一区二区三区四区| 波多野结衣综合网| 国产精品久久久| 欧美日韩激情四射| 国产福利精品在线| 亚洲精品一区二| 色婷婷av一区二区三区久久| 人妻久久久一区二区三区| 爽爽爽爽爽爽爽成人免费观看| 日本不卡免费高清视频| 国产福利视频一区二区| 国产情人节一区| 91国内在线视频| 亚洲一卡二卡区| 成人中文字幕在线播放| 九九精品视频在线| 国产日韩亚洲欧美| 久久亚洲成人精品| 免费一区二区三区| 国产精品久久久久久久7电影| 激情小视频网站| 久久久精品在线| 欧美精品在欧美一区二区|