CONTENTS
Page 3 Apr 11/2002 D623N005
THIS PAGE INTENTIONALLY LEFT BLANK
LIST OF FIGURES
Figure Title Page
2-1 PRINCIPAL AIRPLANE DIMENSIONS 757-200 2-2 2-2 PRINCIPAL AIRPLANE DIMENSIONS 757–300 2-3 2-3 PW2000 SERIES ENGINE COMPONENT WEIGHTS 2-5 2-4 ENGINE COMPONENTS -LEFT SIDE 2-6 2-5 ENGINE COMPONENTS -RIGHT SIDE 2-7 2-6 BARE ENGINE DIMENSIONS 2-9 2-7 NACELLE ASSEMBLIES 2-16 2-8 THRUST REVERSER 2-17 2-9 ENGINE AND NACELLE DIMENSIONS 2-18 2-10 NACELLE COMPONENT WEIGHTS AND CG 2-19 2-11 STRUT FAIRING INSTALLATION 2-21 2-12 STRUT AND ENGINE MOUNT INSTALLATION 2-23 2-13 FORWARD ENGINE MOUNT 2-24 2-14 AFT ENGINE MOUNT 2-25 3-1 ENGINE GROUND HANDLING POINTS 3-3 3-2 FRONT GROUND HANDLING PAD LOCATIONS 3-4 3-3 REAR GROUND HANDLING POINT LOCATIONS 3-5 3-4 ENGINE SLING 3-7 3-5 BOOTSTRAP INSTALLATION -FORWARD AND AFT 3-10 3-6 INLET COWL SLING 3-12 3-7 INLET COWL DOLLY 3-13 3-8 ACTUATOR HAND PUMP INSTALLATION 3-14 3-9 THRUST REVERSER HOLD-OPEN 3-16 3-10 THRUST REVERSER HANDLING EQUIPMENT 3-17 3-11 TRANSLATING SLEEVE REMOVAL 3-18 3-12 CORE COWL SLING 3-19 3-13 CORE COWL HOLD-OPEN 3-21 3-14 EXHAUST SLEEVE REMOVAL 3-22 3-15 BASIC STRUT DESIGN 3-23 3-16 STRUT INSTALLATION/REMOVAL SLING 3-24 3-17 STRUT PRELOAD FIXTURE 3-25 3-18 NACELLE SIDE LINK ALIGNMENT FIXTURE 3-26 3-19 STRUT UNLOAD SLING WITH THE ENGINE INSTALLED 3-27 3-20 CRADLE AND TRANSPORTATION STAND 3-30
LIST OF FIGURES
Page 1 Apr 11/2002 D623N005
Figure Title Page
3-21 CRADLE AND TRANSPORTATION STAND 3-31 4-1 LIFT FIXTURE -ENGINE ACCESSORY 4-2 4-2 INTEGRATED DRIVE GENERATOR INSTALLATION/REMOVAL EQUIPMENT 4-3 4-3 PRECOOLER HANDLING EQUIPMENT 4-4 5-1 ENGINE AIR TRANSPORT CAPABILITY -PW2000 SERIES 5-3 5-2 PW2000 SERIES SPLIT-ENGINE AIR TRANSPORT -POTENTIAL 5-4 5-3 3-PALLET SPLIT-ENGINE TRANSPORTATION SYSTEM 5-5 5-4 PW2000 SERIES ENGINE TRANSPORT ON BOEING AIRPLANES 5-6 5-5 PRIMARY FRONT GROUND HANDLING -SIDE PICKUP 5-9 5-6 SECONDARY FRONT GROUND HANDLING -TOP PICKUP 5-11 5-7 ALLOWABLE LIMITS 5-12 5-8 PRIMARY REAR GROUND HANDLING -SIDE PICKUP 5-13 5-9 SECONDARY REAR GROUND HANDLING -TOP PICKUP 5-14 5-10 FORWARD ADAPTER CONCEPT -PW2000 SERIES 5-15 5-11 TRANSPORTATION STAND LOAD FACTORS 5-16 6-1 INTERFACE CONNECTORS (ENGINE) 6-8 6-2 FUEL AND HYDRAULIC INTERFACE CONNECTORS 6-8 6-3 ELECTRICAL INTERFACE CONNECTORS 6-9 6-4 ENGINE SERVICE INTERFACES -LEFT SIDE 6-11 6-5 ENGINE SERVICE INTERFACES -RIGHT SIDE 6-12 6-6 ELECTRICAL WIRING DIAGRAMS 6-13 6-7 ENGINE PRECOOLER DUCT INTERFACES 6-18
LIST OF FIGURES
Page 2 Apr 11/2002 D623N005
PURPOSE
This document provides basic information for operators in handling propulsion components during on-aircraft maintenance and engine build up.
ACRONYMS AND ABBREVIATIONS
Active Clearance Control (ACC)
ASSY (Assembly)Buttock Line (BL)
Body Buttock Line (BBL)
Center of Gravity (CG)
DIA (Diameter)Engine Build Up (EBU)
Electronic Engine Control (EEC) 中國航空網 www.k6050.com 航空翻譯 www.aviation.cn 本文鏈接地址:757 PW2000 Series Engine Ground Handling Document 發動機地面處理文件(4)