54-61-00
ALL ú ú 02 Page 1 ú Jun 10/88
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 747-400 MAINTENANCE MANUAL
UNDERWING
FAIRINGFORWARD
THRUST REVERSER-TO-STRUT FAIRINGS
INBOARD NACELLE STRUT FAIRINGS
Nacelle Strut Fairings
Figure 1
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
54-61-00
ALL ú ú 02 Page 2 ú Feb 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
AFT THRUST REVERSER-TO-STRUT FAIRING PANEL NO. 3 - REMOVAL/INSTALLATION
_______________________________________________________________________
1. General_______
A. This procedure contains two tasks:
(1)
The removal of the the outboard aft thrust reverser-to-strut fairing panel No. 3.
(2)
The installation of the outboard aft thrust reverser-to-strut fairing panel No. 3.
B. The installation procedure has special fastener installation instructions to prevent cracks to the panel.
TASK 54-61-01-004-001
2. Outboard Aft Thrust Reverser-to-Strut Fairing Panel No. 3 Removal (Fig. 401)_________________________________________________________________
A. Access
(1) Location Zone
452 Nacelle Strut 1 - Torque Box
462 Nacelle Strut 2 - Torque Box
472 Nacelle Strut 3 - Torque Box
482 Nacelle Strut 4 - Torque Box
B. Procedure
S 024-002
(1) Remove the fairing panel No. 3.
(a)
Remove the fasteners that attach the fairing panel No. 3.
(b)
Remove the fairing panel No. 3.
TASK 54-61-01-404-003
3. Outboard Aft Thrust Reverser-to-Strut Fairing Panel No. 3 Installation______________________________________________________________________ (Fig. 401)
A. Access
(1) Location Zone
452 Nacelle Strut 1 - Torque Box
462 Nacelle Strut 2 - Torque Box
472 Nacelle Strut 3 - Torque Box
482 Nacelle Strut 4 - Torque Box
B. Procedure
S 424-004
中國航空網 www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:747-400 AMM 飛機維護手冊 NACELLES/PYLONS(87)