曝光臺 注意防騙
網曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費者
PERFORMED
BY
57-00 R.H. WING INSPECTION (AREA 600) 600
57-00 1) Perform an overall visual inspection of area 600. 600
11-00 2) Check installation and legibility of exterior placards and markings - refer to 11-20-00 1. 600
24-00 3) Visually inspect all cable connections in the R.H. wing. 600
Replace cables if damaged. Inspect cables for routing, clamp security, lugs and cleanliness.
27-10 4) Visually inspect the roll control linkage in R.H. wing, inspect bellcranks, attaching hardware, check play, look for wear, interference and corrosion - refer to 27-10-00 201. 600
27-50 5) Visually inspect (do not remove) the R.H. flap control rods. 600
27-50 6) Remove and clean R.H. flap control bellcrancks. Perform a detail examination. Lubricate. Install. 600 1000 hrs
28-10 7) Perform an operational test of the R.H. fuel tank cap and check the seal condition - refer to 28-10-00 301. 600
28-10 8) Inspect the R.N. fuel tank for condition, clean if necessary 600
- refer to 28-10-00 601.
28-10 9) Inspect the draining holes located on the non-sealed ribs of the R.H. fuel tank for partial or total obstruction with sealing compound or any other deposit. 600
28-10 10) Inspect the draining holes located under the low level detector box (if installed) of the R.H. fuel tank for partial or total obstruction with sealing compound or any other deposit. 600
28-10 11) Visually inspect the R.H. fuel tank venting system for condition, security and obstruction. 600
28-20 12) Visually inspect the fuel outlet union on the R.H. wing ; check the line, the support and the grommet ; clean the strainer - refer to 28-20-03 201. 600
28-40 13) Remove the R.H. tank float gages (if installed). 600
Check the floats for porosity and travel, check the tracks and the seal for condition.
Install the float gages - refer to 28-40-01 401.
28-40 14) Remove the R.H. tank capacitor gages (if installed). 600
Check the sensors for condition, check the transmitter for
corrosion or deposits, check the connections for security.
Replace the 0-ring seal.
Install the capacitor gages - refer to 28-40-01 401.
AIM
Validity : S / N 1 - 9999 05-20 (JA) Page JUN 0
222
05 01
ATA "80A" MAJOR INSPECTION
R.H. WING INSPECTION (AREA 600) AREA OTHER
INSPECTION PERFORMED
中國航空網 www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:TB 20 MAINTENANCE MANUAL 05 TIME LIMITS MAINTENANCE CHECKS TB20飛機維護手冊 05 時間限制維護檢查 2(37)