(2)
Make sure that there are no signs of corrosion, cracks or damage.
1EFF : ALL 1 05-23-00Page 601 1 1 May 01/05R 1 1 1CES 1
TASK 05-23-00-200-002
R Zonal Inspection of Stabilizers and Cone/Rear Fuselage
1. Reason for the Job__________________
Refer to the MPD TASK: ZL-300-02
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 4 m (13 ft. 1 in.)
3. Job Set-up__________
Subtask 05-23-00-010-050
A. Get Access
R (1) Put an access platform in position at zone 300.
4. Procedure_________
Subtask 05-23-00-210-051
A. Inspection
R (1) Do a general visual inspection of the stabilizers and cone.
(2) Make sure that there are no signs of corrosion, cracks or damage.
R (3) Do a visual inspection of the drain holes at the inner side of the lower surface of the THS.
R (4) Make sure that the drain holes are not blocked.
R 5. Close-up________
R Subtask 05-23-00-410-050
R A. Close Access
R (1) Remove the access platform(s).
ZONAL INSPECTION : FUSELAGE TAIL SECTION AFT OF AFT PRESSURE BULKHEAD
_____________________________________________________________________ INSPECTION/CHECK
________________ TASK 05-23-10-200-001 Zonal Inspection of the Tail Section of the Aft Fuselage (Zones 311 and 312)
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-311-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2.50 m (8 ft. 2 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
05-23-10-991-001 Fig. 601
3. Job Set-up
__________ Subtask 05-23-10-010-050
A. Get Access
(1)
Put an access platform in position at the zone 310.
(2)
Open the access doors:
312AR, 314AR.
(Ref. Fig. 601/TASK 05-23-10-991-001)
Access Provision of the Aft Fuselage Tail Section
Figure 601/TASK 05-23-10-991-001
1EFF : ALL 1 05-23-10 Page 602
1 1 Feb 01/98
1 1
1CES 1
4. Procedure
_________
Subtask 05-23-10-210-050
A. Inspection
(1)
Do a general visual inspection of the tail section of the aft fuselage (Zones 311 and 312).
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
________ Subtask 05-23-10-410-050
A. Close Access
(1)
Close the access doors:
312AR, 314AR.
(2)
Remove the access platform(s).
TASK 05-23-10-200-002
Zonal Inspection of the Air Intake Area of the APU on the Tail Cone (Zones 313 and 314)
1. Reason for the Job
__________________
Refer to the MPD TASK: ZL-313-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2.50 m (8 ft. 2 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
05-23-10-991-001 Fig. 601
3. Job Set-up
__________ Subtask 05-23-10-010-051
中國航空網 www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:A320飛機維護手冊 AMM 時間限制/維護檢查 3(57)