Access provision of the Aft Fuselage Tail Section
Figure 601/TASK 05-23-30-991-007
1EFF : ALL 1 05-23-30 Page 606
1 1 Feb 01/98
1 1
1CES 1
4. Procedure
_________
Subtask 05-23-30-210-052
A. Inspection
(1) Do a general visual inspection of the spar box of the trimmable horizontal stabilizer.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up________
Subtask 05-23-30-410-052
A. Close Access
R R (1) Install the aprons 333AT, 333AB, 343AT and 343AB (Ref. TASK 55-15-11-400-001).
R (2) Close the access doors 312AR, 314AR.
R (3) Remove the access platform(s).
TASK 05-23-30-200-004
Zonal Inspection of the Trailing Edge of the Trimmable Horizontal Stabilizer
1. Reason for the Job
__________________
Refer to the MPD TASK: ZL-334-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 4 m (13 ft. 1 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
55-13-11-000-001 Removal of the THS Trailing Edge Access Panels 55-13-11-400-001 Installation of the THS Trailing Edge Access Panels
3. Job Set-up
__________ Subtask 05-23-30-010-053
A. Get Access
(1)
Put an access platform in position.
(2)
Remove the trailing edge access panels:
334BB, 334DB, 334FB, 334HB.
344BB, 344DB, 344FB, 344HB. (Ref. TASK 55-13-11-000-001)
4. Procedure
_________
Subtask 05-23-30-210-053
A. Inspection
(1)
Do a general visual inspection of the trailing edge of the trimmable horizontal stabilizer.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
________ Subtask 05-23-30-410-053
A. Close Access
(1)
Install the trailing edge access panels: 334BB, 334DB, 334FB, 334HB 344BB, 344DB, 344FB, 344HB. (Ref. TASK 55-13-11-400-001)
(2)
Remove the access platform(s).
TASK 05-23-30-200-005
Zonal Inspection of the Elevator
1. Reason for the Job
__________________
Refer to the MPD TASK: ZL-335-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 3 m (9 ft. 10 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
55-13-11-000-001 Removal of the THS Trailing Edge Access Panels 55-13-11-400-001 Installation of the THS Trailing Edge Access Panels 55-22-11-000-001 Removal of the Elevator Leading Edge Access Panels
335AB (345AB), 335BB (345BB), 335CB (345CB), 335DB (345DB).
55-22-11-400-001 Installation of the Elevator Leading Edge Access Panels 335AB (345AB), 335BB (345BB), 335CB (345CB), 335DB (345DB).
中國航空網 www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:A320飛機維護手冊 AMM 時間限制/維護檢查 3(64)