1) Connect a ground cable from the aircraft to an approved ground terminal.
2) Connect tanker ground cable to an approved ground terminal.
3) Connect a tanker / aircraft connection cable.
4) Connect ground wires from fuel nozzle to ground points on aircraft (if none, on gear leg).
5) Unlock and remove filler cap.
6) Insert fuel nozzle into filler port and complete fueling.
7) Remove fuel nozzle.
8) Install filler cap and lock securely.
9) Disconnect ground cables.
10) Close main switch-breaker.
11) Make sure the fuel quantity displayed on the gage indicator is correct.
12) Open main switch-breaker.
AAAA
Validity : S / N 1 - 9999 12-11-01Page 301
(BA) JUN 02
PAGE INTENTIONALLY LEFT BLANK
AAAA
Validity : S / N 1 - 9999 12-11-01Page 302
(BA) JUN 02
BLEEDING AND DEFUELING
SERVICING
WARNING : OBEY THE SAFETY PRECAUTIONS DESCRIBED IN 28-00-00.
NOTE : This procedure is applicable to L.H. and R.H. installations. Information specific to R.H. installation are given in square brackets.
1. FUEL BLEEDING (Figures 301 and 301A)
A. Tools and consumable materials
- Ground cable
- Extinguisher
- Sampler Z00.N6023657220
B. Procedure
WARNING : THE POWER PLANT MUST NOT BE OPERATED.
THE AIRCRAFT ELECTRICAL CIRCUIT MUST BE SWITCHED OFF.
DURING ALL BLEEDING OR DEFUELING OPERATIONS, FIRE FIGHTING EQUIPMENT MUST BE AVAILABLE.
CAUTION : DURING BLEEDING OR DEFUELING OF THE TANKS AND / OR THE SYSTEM, FUEL HAS TO BE KEPT IN A CONTAINER. DO NOT LEAVE THE FUEL FLOW ON THE GROUND.
1) Connect a ground cable from the aircraft to an approved ground terminal.
2) Use sampler (3) to press bleed valve (2).
3) Release once bleeding is completed.
4) Disconnect the ground cable.
2. FUEL SYSTEM DEFUELING (Figures 301 and 301A)
A. Tools and consumable materials
- Ground cable
- Torque wrench 0 - 442 lbf.in (0 - 50 Nm)
- Fork wrench 1"5/16 (33 mm)
- Cleaning agent (TB 11-003)
- Loctite (TB 08-013C)
- Clean linffree cloths
- Extinguisher
- 2 drain containers [Min. capacity 27.7 US Gal (105 L each)]
- Stainless steel lockwire, dia. 0.02 in (0.6 mm)
WA
Validity : S / N 1 - 9999 1 2-11 -02Page 301
(BA) JUN 02
B. Tank defueling procedure
WARNING : PERFORM DEFUELING IN AREAS WHICH PERMIT FREE MOVEMENT OF FIRE FIGHTING EQUIPMENT.
THE POWER PLANT MUST NOT BE OPERATED.
DURING THUNDERY WEATHER, DO NOT PERFORM DEFUELING.
DURING ALL BLEEDING OR DEFUELING OPERATIONS, FIRE FIGHTING EQUIPMENT MUST BE AVAILABLE.
CAUTION : DURING BLEEDING OR DEFUELING OF THE TANKS AND / OR THE SYSTEM, FUEL HAS TO BE KEPT IN A CONTAINER. DO NOT LEAVE THE FUEL FLOW ON THE GROUND.
中國航空網(wǎng) www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:
TB20 MAINTENANCE MANUAL 12 SERVICING TB20飛機維護手冊 12 保養(yǎng)(18)