国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽

  • 熱門標簽

當前位置: 主頁 > 航空資料 > 國外資料 > FAA >

時間:2011-04-18 01:03來源:藍天飛行翻譯 作者:航空
曝光臺 注意防騙 網曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費者

20.1.2.3 In SOIA, the approach course separation (instead of the runway separation) meets established close parallel approach criteria. Refer to FIG ENR 1.5.31 for the generic SOIA approach geometry. A visual segment of the LDA/PRM approach is established between the LDA MAP and the runway threshold. Aircraft transition in visual conditions from the LDA course, beginning at the LDA MAP, to align with the runway and can be stabilized by 500 feet above ground level (AGL) on the extended runway centerline. Aircraft will be “paired” in SOIA operations, with the ILS aircraft ahead of the LDA aircraft prior to the LDA aircraft reaching the LDA MAP. A cloud ceiling for the approach is established so that the LDA aircraft has nominally 30 seconds to acquire the leading ILS aircraft prior to the LDA aircraft reaching the LDA MAP. If visual acquisition is not accomplished, a missed approach must be executed.
20.2 Requirements.
20.2.1 Besides system requirements as identified in subparagraph 20.1 above all pilots must have completed special training before accepting a clearance to conduct ILS/PRM or LDA/PRM Simultaneous Close Parallel Approaches.
20.2.1.1 Pilot Training Requirement. Pilots must complete special pilot training, as outlined below, before accepting a clearance for a simultaneous close parallel ILS/PRM or LDA/PRM approach.
 a) For operations under 14 CFR Parts 121, 129, and 135 pilots must comply with FAA approved company training as identified in their Operations Specifications. Training, at a minimum, must require pilots to view the FAA video “ILS PRM AND SOIA APPROACHES: INFORMATION FOR AIR CAR-RIER PILOTS.” Refer to http://www.faa.gov for additional information and to view or download the video.
 b) For operations under Part 91:
 1) Pilots operating transport category aircraft must be familiar with PRM operations as contained in this section of the Aeronautical Information Publication (AIP). In addition, pilots operating transport category aircraft must view the FAA video “ILS PRM AND SOIA APPROACHES: IN-FORMATION FOR AIR CARRIER PILOTS.” Refer to http://www.faa.gov for additional informa-tion and to view or download the video.
 2) Pilots not operating transport category aircraft must be familiar with PRM and SOIA operations as contained in this section of the AIP.  The FAA strongly recommends that pilots not involved in transport category aircraft operations view the FAA video, “ILS PRM AND SOIA APPROACHES: INFORMATION FOR GENERAL AVIATION PILOTS.” Refer to http://www.faa.gov for addition-al information and to view or download the video.

FIG ENR 1.5.32
SOIA Approach Geometry

NOTE. 
SAP  The SAP is a design point along the extended centerline of the intended landing runway on the 
glide slope at 500 feet above the landing threshold. It is used to verify a sufficient distance is 
provided for the visual maneuver after the missed approach point (MAP) to permit the pilots to 
conform to approved, stabilized approach criteria. 
MAP  The point along the LDA where the course separation with the adjacent ILS reaches 3,000 feet. 
The altitude of the glide slope at that point determines the approach minimum descent altitude 
and is where the NTZ terminates. Maneuvering inside the MAP is done in visual conditions. 
Angle  Angle formed at the intersection of the extended LDA runway centerline and a line drawn between 
the LDA MAP and the SAP. The size of the angle is determined by the FAA SOIA computer design 
program, and is dependent on whether Heavy aircraft use the LDA and the spacing between the 
runways. 
Visibility  Distance from MAP to runway threshold in statute miles (light credit applies). 
Procedure  LDA aircraft must see the runway landing environment and, if less than standard radar 
separation exists between the aircraft on the adjacent ILS course, the LDA aircraft must visually 
acquire the ILS aircraft and report it in sight to ATC prior to the LDA MAP. 
CC  Clear Clouds. 

Federal Aviation Administration Twentieth Edition
20.2.1.2 ATC Directed Breakout. An ATC di-rected “breakout” is defined as a vector off the ILS or LDA approach course in response to another aircraft penetrating the NTZ, the 2,000 foot wide area located equidistance between the two approach courses that is monitored by the PRM monitor controllers.
20.2.1.3 Dual Communications. The aircraft fly-ing the ILS/PRM or LDA/PRM approach must have the capability of enabling the pilot/s to listen to two communications frequencies simultaneously.
20.3 Radar Monitoring. Simultaneous close par-allel ILS/PRM and LDA/PRM approaches require that final monitor controllers utilize the PRM system to ensure prescribed separation standards are met. Procedures and communications phraseology are also described in paragraph 19., Simultaneous Parallel ILS/MLS Approaches (Independent). A minimum of 3 miles radar separation or 1,000 feet vertical separation will be provided during the turn.on to close parallel final approach courses. To ensure separation is maintained, and in order to avoid an imminent situation during simultaneous close parallel ILS/PRM or SOIA ILS/PRM and LDA/PRM approaches, pilots must immediately comply with PRM monitor controller instructions. In the event of a missed approach, radar monitoring is provided to one.half mile beyond the most distant of the two runway departure ends for ILS/RPM approaches. In SOIA, PRM radar monitoring terminates at the LDA MAP. Final monitor controllers will not notify pilots when radar monitoring is terminated.
 
中國航空網 www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:美國航行情報匯編 AERONAUTICAL INFORMATION PUBLICATION AIP 2(107)

国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
久久综合色视频| 激情五月婷婷六月| 一级特黄妇女高潮| 欧美亚洲国产日韩2020| 欧美成人高潮一二区在线看| 成人福利网站在线观看11| 久久精品一偷一偷国产| 亚洲欧洲国产精品久久| 黄黄视频在线观看| 国产成人精品久久久 | www.欧美日本| 国产高清不卡无码视频| 国产精品高潮粉嫩av| 日本亚洲欧美成人| 97精品视频在线| 欧美情侣性视频| 免费观看国产成人| 久久久久久久国产精品视频| 欧美日本精品在线| 美女日批免费视频| 日韩中文字幕在线视频播放| 日韩一区不卡| 99久热re在线精品视频| 精品乱子伦一区二区三区| 欧美一区少妇| 久草精品电影| 亚洲免费精品视频| 亚洲最大福利网| 国产福利久久| 日本一区二区三区视频免费看| 97久久精品视频| 欧美成人精品一区二区三区| 国产日产久久高清欧美一区| 欧美激情视频在线观看| 黄色高清无遮挡| 欧洲黄色一级视频| 99视频免费观看蜜桃视频| 一区二区三区一级片| 欧美xxxx黑人又粗又长精品| 欧美乱妇高清无乱码| 人妻夜夜添夜夜无码av| 久久福利视频网| 久久资源av| 热久久美女精品天天吊色| 国产尤物99| 欧美激情小视频| 国产va免费精品高清在线| 国产精品av在线播放| 久久97久久97精品免视看| 精品一区二区视频| 国产精品黄页免费高清在线观看| 欧美高清中文字幕| 国产精品久久9| 国产色一区二区三区| 欧美日韩国产123| www精品久久| 日日噜噜夜夜狠狠久久丁香五月| 国产精品自产拍高潮在线观看| 国产99视频精品免视看7| 国产精品尤物福利片在线观看| 欧美日韩ab片| 91福利视频网| 日韩精品无码一区二区三区免费| 国产成人免费电影| 国产综合香蕉五月婷在线| 九九热r在线视频精品| 99久久国产宗和精品1上映| 宅男av一区二区三区| 成人av一级片| 懂色av一区二区三区四区五区| 久久影视中文粉嫩av| 日韩精品第1页| 久99久视频| 国内自拍在线观看| 欧美激情视频在线观看| 91禁国产网站| 欧美在线视频二区| 欧美精品在线网站| 91美女福利视频高清| 欧洲久久久久久| 国产精品爽黄69天堂a| 国产精品专区一| 日韩 欧美 自拍| 国产精品成人国产乱一区| 不卡视频一区二区三区| 日韩精品视频一区二区在线观看| 不用播放器成人网| 免费国产在线精品一区二区三区| 中文字幕一区二区中文字幕| 久久波多野结衣| 国产一区欧美二区三区| 欧美精品激情视频| 日韩亚洲综合在线| 国产精品影院在线观看| 日韩精品一区二区三区色欲av| 国产精品久久久久久av下载红粉 | 人妻无码久久一区二区三区免费| 国产精品乱子乱xxxx| 91极品视频在线| 黄页网站在线观看视频| 欧美精品久久久久久久免费观看| 国产高清精品一区二区| 亚洲xxxx视频| 亚洲 国产 日韩 综合一区| 午夜啪啪免费视频| 日日骚一区二区网站| 精品一区久久久| 成人av色在线观看| 国产精品久久久久久五月尺| 日韩免费观看网站| 97碰碰碰免费色视频| 欧美精品videos| 99三级在线| 欧美巨猛xxxx猛交黑人97人| 91久久偷偷做嫩草影院| 国产精品久久久久久久天堂第1集| 国内精品久久久久久中文字幕| 国产成人a亚洲精v品无码| 精品中文字幕在线观看| 国产精品一区av| 一区视频二区视频| 欧美激情图片区 | 久久久精品久久久| 日韩午夜在线视频| www.国产一区| 日韩视频永久免费观看| 国产极品粉嫩福利姬萌白酱| 久久综合色视频| 国产成人福利视频| 久久久久久久久久久久久久国产| 久久久久久久久久久久久国产| 久久久免费av| 日韩一级裸体免费视频| 精品国产依人香蕉在线精品| 国产精品视频久久久| 国产精品成人观看视频国产奇米| 久久亚洲一区二区三区四区五区高 | 亚洲国产成人不卡| 欧美一级免费看| 日韩一二区视频| 欧美牲交a欧美牲交aⅴ免费下载 | 久久久人成影片一区二区三区 | 欧美激情精品久久久久| 制服诱惑一区| 在线免费一区| 色欲色香天天天综合网www | 久久偷看各类wc女厕嘘嘘偷窃| 国产成人一二三区| www.日韩免费| 精品久久久久av| 欧美一区二区视频在线| 热99这里只有精品| 麻豆一区二区三区在线观看| 成人免费在线小视频| 国产高清精品在线观看| 国产精品网站视频| 欧美激情欧美激情在线五月| 中文字幕成人一区| 日韩人妻无码精品久久久不卡| 激情小说网站亚洲综合网| 成人久久18免费网站漫画| 久久偷看各类wc女厕嘘嘘偷窃| 国产精品丝袜一区二区三区| 九九热精品在线| 日韩一级片一区二区| 黄色片视频在线播放| 白嫩少妇丰满一区二区| 日韩中文娱乐网| 欧美精品性视频| 日韩欧美在线播放视频| 国产日韩欧美在线| 久久久久久久久久久视频| 欧美成年人视频网站| 日韩有码免费视频| 国产视频一区二区三区四区 | 欧美久久久久久一卡四| 99在线免费视频观看| 久久久久久久电影一区| 欧美激情一二区| 日韩精品在线视频免费观看| 国产女精品视频网站免费| 久久久久日韩精品久久久男男| 精品国产三级a∨在线| 品久久久久久久久久96高清| 粉嫩av四季av绯色av第一区| 日韩在线激情视频| 亚洲一区二区三区欧美| 蜜桃av噜噜一区二区三| 久久久久五月天| 亚洲欧洲一区二区在线观看| 麻豆av一区| 色吧影院999| 日韩影院一区| www..com日韩| 精品国产一二| 免费国产成人av| 久久人人爽亚洲精品天堂| 日韩欧美精品在线不卡| 久热国产精品视频一区二区三区| 国产999视频|