国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽

  • 熱門標簽

當前位置: 主頁 > 航空資料 > 國外資料 >

時間:2010-08-15 08:53來源:藍天飛行翻譯 作者:admin
曝光臺 注意防騙 網曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費者

be checked before inertial systems are aligned and the position should be recorded in the flight log and/or
Master Document. It is recommended that subsequent 'silent' checks of the present position and of the
inertial velocity outputs (e.g. ground speed registering zero) be carried out independently by both pilots
during (an early stage of) the pre-flight checks and again just before the aircraft is moved. Any discrepancies
should be investigated.
8.3.2 With regard to the insertion of the initial co-ordinates whilst on the ramp, the following
points should be taken into account:
in some inertial systems, insertion errors exceeding about one degree of latitude will
illuminate a malfunction light. It should be noted that very few systems provide protection
against longitude insertion errors.
at all times, but particularly in the vicinity of the Zero Degree E/W (Greenwich) Meridian or
near to the Equator, care should be taken to ensure that the co-ordinates inserted are correct.
(i.e. E/W or N/S).
NORTH ATLANTIC MNPSA OPERATIONS MANUAL CHAPTER 8
NAT MNPS 45 Edition 2009
System Alignment
8.3.3 The alignment of inertial systems must be completed and the equipment put into navigation
mode prior to releasing the parking brake at the ramp. Some systems will align in about 10 minutes, others
can take 15 minutes or more; expect alignment to take longer in extreme cold or at higher latitudes or when
the aircraft (and hence the inertial platform) is buffeted by winds or rocked during cargo loading. A rapid
realignment feature is sometimes provided but should only be used if, during an intermediate stop, it
becomes necessary to increase the system accuracy. The aircraft must be stationary during rapid realignment
which typically will take about one minute.
8.3.4 To ensure that there is adequate time for the initial alignment, the first crew member on the
flight deck should normally put the inertial system(s) into the align mode as soon as practicable.
GNSS (GPS) Systems
8.3.5 As with all LRNS operations, GPS LRNS operations must be approved by the State of the
Operator (or the State of Registry for International General Aviation operations) as part of the MNPS
operational approval. When both the LRNSs required for unrestricted MNPS operations are GPSs the
approval of their operation will include the requirement to carry out Pre-Departure Satellite Navigation
Prediction Programmes (as shown below). When only one of the two LRNSs required is a GPS, State
Authorities vary as to whether they require their operators to conduct such pre-departure programmes.
Satellite Availability
8.3.6 Given suitable geometry:
- Four satellites are required to determine 3-D position;
8.3.7 For Receiver Autonomous Integrity Monitoring (RAIM) purposes:
- Five satellites are required to detect the presence of a single faulty satellite;
8.3.8 For Fault Detection and Exclusion (FDE) purposes:
- Six satellites are required to identify a faulty satellite and exclude it from participating in
further navigation solution calculations. (Note that an FDE algorithm is normally
associated with a RAIM algorithm).
Note: the above numbers of satellites (for RAIM and FDE purposes only) may in each case be
reduced by one if barometric aiding is used.
Satellite Navigation Prediction
8.3.9 When so required, operators intending to conduct GPS navigation in MNPS Airspace must
utilise a Satellite Navigation Availability Prediction Programme specifically designated for the GPS
equipment installed. This prediction programme must be capable of predicting, prior to departure for flight
on a "specified route"*, the following:
a) Any loss of navigation coverage (meaning that less than 3 satellites will be in view to the
receiver);
and
b) Any loss of the RAIM function and its duration.
*Note: "specified route" is defined by a series of waypoints (to perhaps include the route to any
required alternate), with the time between waypoints based on planned speeds. Since flight
planned ground speeds and/or departure times may not be met, the pre-departure prediction must
be performed for a range of expected ground speeds.
8.3.10 This prediction programme must use appropriate parameters from the RAIM algorithm
employed by the installed GPS equipment. In order to perform the predictions this programme must provide
NORTH ATLANTIC MNPSA OPERATIONS MANUAL CHAPTER 8
NAT MNPS 46 Edition 2009
the capability to manually designate satellites that are scheduled to be unavailable. Such information is not
included in the GPS almanac or ephemeris data in the navigation message (i.e. the GPS receiver does not
receive this information). Information on GPS satellite outages is promulgated via the U.S. NOTAM Office.
 
中國航空網 www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:航空翻譯14(120)
国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
午夜精品久久久久久久白皮肤| 人偷久久久久久久偷女厕| 欧美怡春院一区二区三区 | 国产aaa精品| 91久久精品视频| 国产欧美一区二区在线播放| av观看久久| 国产深夜精品福利| 91精品中文在线| 黄色影院一级片| 日本一区二区三区免费观看| 午夜精品在线观看| 午夜精品短视频| 亚洲欧美精品| 亚洲精品电影在线一区| 亚洲啊啊啊啊啊| 偷拍视频一区二区| 欧美一级视频在线播放| 亚洲欧美日韩精品久久久| 欧美激情第6页| 精品国产三级a∨在线| 美日韩精品免费视频| 品久久久久久久久久96高清| 色与欲影视天天看综合网| 麻豆成人在线看| 亚洲一卡二卡三卡| 亚洲视频在线二区| 无码无遮挡又大又爽又黄的视频| 日韩在线视频在线| 欧美精品一区二区三区久久| 免费观看国产精品视频| 国产欧美日韩综合精品| 国产日韩久久| 91精品美女在线| 国产精品丝袜视频| 永久免费看av| 欧洲亚洲在线视频| 国产日韩精品入口| 久久综合九色综合88i| 国产精国产精品| 国产精品国产福利国产秒拍| 污污污污污污www网站免费| 久久久免费在线观看| 91久久久亚洲精品| 久久99精品久久久久久秒播放器 | 国内精品一区二区| 丰满人妻中伦妇伦精品app| 国产精品99久久久久久久| 久久久久久久爱| 亚洲午夜激情| 欧美日韩亚洲综合一区二区三区激情在线| 精品一区二区国产| 国产欧美日韩小视频| 91精品国产综合久久久久久蜜臀| 丝袜美腿精品国产二区| 中文精品无码中文字幕无码专区| 欧美亚洲另类视频| 久久久久久久久久久免费视频| 国产精品久久久久久久久久久久冷| 水蜜桃亚洲精品| www.av蜜桃| 一区二区视频在线免费| 蜜桃91精品入口| 国产精品入口夜色视频大尺度| 日本人成精品视频在线| 91精品成人久久| 性亚洲最疯狂xxxx高清| 久久久com| 亚洲精品电影在线一区| 99视频国产精品免费观看| 欧美激情视频一区| 成人精品网站在线观看| 久国内精品在线| 成人av一级片| 日本午夜精品一区二区三区| 国产l精品国产亚洲区久久| 天天久久人人| 俺去亚洲欧洲欧美日韩| 欧美日韩视频免费| 欧美精品免费播放| www国产免费| 日韩免费高清在线观看| 亚洲专区在线视频| 色婷婷综合久久久久中文字幕1| 99在线看视频| 欧洲美女7788成人免费视频| 国产精品久久久久久久美男| 国产免费黄色小视频| 午夜啪啪福利视频| 国产精品久久久久久久久粉嫩av | 浮妇高潮喷白浆视频| 日本精品一区二区三区不卡无字幕 | 国产免费一区二区三区| 三级网在线观看| 国产精品高清在线观看| 久久亚洲私人国产精品va| 国产精品一区专区欧美日韩| 日本一区二区三区在线视频| 久久精品夜夜夜夜夜久久| 久久艹国产精品| 欧美日韩亚洲在线| 国产一区免费在线观看| 黄页免费在线观看视频| 国产欧美精品一区二区三区介绍| 免费高清一区二区三区| 国产一区二区久久久| 成人精品久久av网站| 国产青青在线视频| 国产欧美日韩亚洲精品| 77777亚洲午夜久久多人| 国产成人自拍视频在线观看| 久久久久在线观看| 国产精品九九久久久久久久| 国产精品电影久久久久电影网| 欧美成人午夜剧场免费观看| 一区中文字幕在线观看| 日韩欧美在线观看强乱免费| 黄色国产小视频| 99久久久精品免费观看国产| 日韩在线精品一区| 欧美精品videofree1080p| 欧美一级免费播放| 欧美自拍视频在线| 91高清视频免费| 国产精品免费看久久久香蕉 | 国产九色91| 久久久免费av| 欧美激情一区二区三级高清视频| 日韩一级在线免费观看| 欧美专区第一页| 97人人干人人| 国产精品青草久久久久福利99| 日本国产中文字幕| 国产美女高潮久久白浆| 久久久精品在线观看| 九九热在线精品视频| 青草视频在线观看视频| av免费精品一区二区三区| 国产精品激情自拍| 秋霞毛片久久久久久久久| 国产成人黄色片| 色婷婷精品国产一区二区三区| av动漫在线播放| 欧美激情乱人伦一区| 国内一区二区三区在线视频| 久久精品国产精品亚洲| 狠狠色噜噜狠狠色综合久| 久久久久久久国产| 欧美h视频在线观看| 国产精品人人做人人爽| 日韩欧美一区二区在线观看| 久久人91精品久久久久久不卡| 中文字幕一区二区三区四区五区人| 麻豆91av| 不卡中文字幕av| 国产中文一区二区| 国产精品福利观看| 99se婷婷在线视频观看| 亚洲va码欧洲m码| 国产传媒一区二区三区| 日韩国产欧美精品| 国产成人涩涩涩视频在线观看| 欧美激情视频一区二区三区| 国产精品久久久久久久电影| 区一区二区三区中文字幕| 国产精品电影网站| 欧美成人精品免费| 欧美日本中文字幕| 91精品视频在线播放| 欧美日韩亚洲免费| 中文字幕精品—区二区日日骚| 99精品在线直播| 欧美日韩免费观看一区| 国产精品日韩精品| 风间由美久久久| 欧美一级大片在线观看| 国产aaa精品| 久久99精品久久久久久久久久| 激情久久av| 大j8黑人w巨大888a片| 久久99精品视频一区97| 99国内精品久久久久久久软件| 激情小说综合网| 日韩精品一区二区三区外面| 亚洲高清乱码| 国产精品久久九九| 久久久久国产精品熟女影院| 国产免费黄视频| 国产色视频一区| 欧美视频在线观看网站| 亚洲va码欧洲m码| 国产99在线免费| 国产精品美女免费看| 久久久久久久久久久久久久久久av | 国产精品久久中文| 国产嫩草一区二区三区在线观看| 都市激情久久久久久久久久久 | 欧美xxxx14xxxxx性爽| 国产精品91视频| 黄色国产精品一区二区三区|