国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽

  • 熱門標簽

當前位置: 主頁 > 航空資料 > 國外資料 >

時間:2010-05-10 17:57來源:藍天飛行翻譯 作者:admin
曝光臺 注意防騙 網曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費者

an emergency landing without undue hazard to persons or
property on the surface.” This allows long fi nal approaches
“with power when necessary,” but overall, it is important to
be no lower than an altitude from which you can glide to a safe
landing area. For the purposes of this approach-and-landing
discussion, it is assumed that there are no safe landing areas
other than the runway.
It should be noted that the power is above idle for some
landing situations, such as:
• Students fi rst learning to land; a slower rate of descent
is the result of higher power settings. In this case, the
landings would be done with a target farther down the
runway so a safe landing could always be made with
engine failure.
• Shallower descent angle if directed by air traffi c control
(ATC), or a longer fi nal approach is required.
• High winds and/or turbulent conditions requiring a
higher energy level.
For landings where throttle is required, the foot throttle is
typically used so the hands can stay on the control bar while
approaching the ground for this critical phase of fl ight.
However, the hand/cruise throttle may be set above idle for
specifi c situations as required by the pilot. Higher power
settings for approaches and landings are discussed later in
this chapter.
Base Leg
The placement of the base leg is one of the more important
judgments made by the pilot in any landing approach.
[Figure 11-1] The pilot must accurately judge the altitude
and distance from which the descent results in landing at
the desired point.
The base leg should be started at a point where the power
can be brought back to idle and the WSC aircraft can glide to
the landing spot at the approach speed recommended by the
manufacturer. The intended landing point should not be at the
end of the runway on a threshold or numbers, but beyond at
the landing lines. [Figure 11-2] This provides some margin
if the landing is shorter than anticipated. For smaller runways
that do not have these markings, establish an appropriate
11-3
Aiming Point for Landings
Figure 11-2. Typical landing position on runway.
36
18
Figure 11-1. Base leg and final approach.
landing point beyond the start of the runway, allowing plenty
of room for the after-landing roll. At much larger airports, the
landing can be done farther down the runway or at a location
where the pilot can taxi off the runway and not delay other
air traffi c behind the aircraft.
After turning onto the base leg, the pilot should continue
the descent with reduced power and approach airspeed as
recommended by the manufacturer. As discussed in Chapter
7, Takeoff and Departure, this speed is at least 1.3 times the
stall speed. Landing trim should be adjusted according to
manufacturer specifi cations (if equipped).
Drift correction should be established and maintained to follow
a ground track perpendicular to the extension of the centerline
of the runway on which the landing is to be made. Since the
fi nal approach and landing are normally made into the wind,
there may be a crosswind during the base leg. The aircraft must
be angled suffi ciently into the wind to prevent drifting farther
away from the intended landing point.
The base leg should be continued to the point where a
medium- to shallow-banked turn aligns the aircraft’s path
directly with the centerline of the landing runway. This
descending turn should be completed at a safe altitude that is
dependent upon the height of the terrain and any obstructions
along the ground track. The turn to the fi nal approach should
also be suffi ciently above the airport elevation to permit a
11-4
Figure 11-4. Turning from base onto final.
Runway
Figure 11-3. On base preparing to turn onto final.
Figure 11-5. Lining up on the runway centerline and maintaining
position.
fi nal approach long enough for the pilot to accurately estimate
the resultant point of touchdown, while maintaining the
proper approach airspeed. This requires careful planning
for the starting point and radius of the turn. [Figure 11-3]
Normally, it is recommended that the angle of bank not
exceed a medium bank because the steeper the angle of bank,
the higher the airspeed at which the aircraft stalls. Since the
base-to-fi nal turn is made at a relatively low altitude, it is
important that a stall not occur at this point. If an extremely
steep bank is needed to prevent overshooting the proper fi nal
approach path, it is advisable to discontinue the approach, go
around, and plan to start the turn earlier on the next approach
 
中國航空網 www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:Weight-Shift Control Aircraft Flying Handbook(114)
国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
成人国产一区二区三区| 国产精品大陆在线观看| 国产精品久久久久久久久久久久久久 | 久久久久久久久久久99| 日韩久久精品一区二区三区| 国产精品色婷婷视频| 国产欧美一区二区三区久久| 亚洲砖区区免费| 久久精品99久久| 黄色影视在线观看| 伊人久久99| 九色综合婷婷综合| 精品人妻大屁股白浆无码| 欧美精品午夜视频| 无码少妇一区二区三区芒果| 色噜噜国产精品视频一区二区| 欧美 日韩 国产精品| 久久夜色精品国产欧美乱| 国产精品一区二区欧美| 国产日韩中文字幕| 五月天亚洲综合情| 国产精品视频二| 成人h在线播放| 日韩欧美亚洲日产国产| 欧美成在线视频| 久久免费一级片| 狠狠久久综合婷婷不卡| 亚洲自拍小视频| 久久视频这里只有精品| 成人91免费视频| 欧美综合在线观看视频| 宅男噜噜99国产精品观看免费| 久久男人的天堂| 国产日韩在线一区| 日韩精品一区二区在线视频| 欧美激情喷水视频| 日韩在线资源网| 成人a级免费视频| 欧美精品尤物在线| 亚洲最大福利视频网站| 久久久av一区| 91精品国产高清自在线| 蜜桃传媒视频麻豆第一区免费观看| 亚洲欧美日韩精品久久久| 国产精品免费久久久久影院| 69av在线视频| 国产一区二区三区黄| 日韩av高清在线播放| 国产99久久精品一区二区 | 国产日韩精品推荐| 日韩欧美精品在线不卡| 欧美日本亚洲视频| 久久精品久久久久久国产 免费| av一区二区三区四区电影| 欧美日韩亚洲综合一区二区三区激情在线| 亚洲淫片在线视频| 国产精品电影观看| 色青青草原桃花久久综合| 99久热re在线精品视频| 国产主播精品在线| 欧美在线中文字幕| 亚洲色图自拍| 欧美精品电影在线| 久久亚洲精品视频| 久久久久北条麻妃免费看| 国产不卡在线观看| dy888夜精品国产专区| 精品少妇人欧美激情在线观看| 日韩视频一二三| 日韩一区二区三区资源| 欧美激情一二三| 国产精品日韩在线| 精品国产一区二区三区四区在线观看 | 欧美激情喷水视频| 国产精品美女午夜av| 国产成人免费av电影| 久久久久久久久爱| 久久久久久美女| 久草一区二区| 国产二区不卡| 国产不卡视频在线| 久久久com| 久久综合亚洲精品| 91国偷自产一区二区三区的观看方式| 国产精自产拍久久久久久蜜| 国产欧美高清在线| 国产精品影片在线观看| 国产精品自拍视频| 国产精品一区二区三区成人| 国产乱子夫妻xx黑人xyx真爽| 国产一区二区视频在线观看| 国产综合色香蕉精品| 国产在线精品一区| 国产日韩在线看| 国产日韩亚洲欧美在线| 国产欧美婷婷中文| 成人3d动漫一区二区三区| www国产免费| 韩国欧美亚洲国产| 欧洲在线视频一区| 性一交一乱一伧国产女士spa| 中日韩在线视频| 国产精品久久久一区| 久久国产精品免费一区| 久久久一二三四| 国产在线一区二区三区| 欧美日韩电影一区二区三区| 天天爽天天狠久久久| 一区二区不卡在线视频 午夜欧美不卡' | 国产av第一区| 欧美伦理91i| 国产精品久久国产| 日韩中文字幕在线免费| 久久99久久99精品免观看粉嫩| 一本一本a久久| 日本免费在线精品| 黄页网站在线观看视频| 国产免费一区二区三区| 91黄在线观看| 久久久久中文字幕2018| 国产精品美女xx| 中文字幕日韩精品一区二区| 亚洲综合最新在线| 日日鲁鲁鲁夜夜爽爽狠狠视频97| 欧洲视频一区二区三区| 国产综合久久久久久| 91九色蝌蚪成人| www.色综合| 欧美精品九九久久| 日韩福利在线| 国产一区二区三区在线免费| 91国内在线视频| www.欧美精品| 久久久久久国产精品三级玉女聊斋| 亚洲va久久久噜噜噜久久天堂| 欧美在线一区视频| av在线不卡观看| 亚洲综合色av| 国产精品黄色av| 岳毛多又紧做起爽| 天天干天天操天天干天天操| 人人做人人澡人人爽欧美| 韩国欧美亚洲国产| 福利视频一二区| 91av中文字幕| 日韩中文娱乐网| 国产精品国色综合久久| 欧美激情一区二区三区高清视频| 亚洲天堂av免费在线观看| 亚洲国产精品一区在线观看不卡| 婷婷四房综合激情五月| 日韩精品大片| 国内精品免费午夜毛片| 国产一区喷水| 91精品久久久久久久久久久久久久 | 99免费在线视频观看| 久久精品成人一区二区三区| 亚洲欧美国产精品桃花| 蜜桃91精品入口| 久久久久亚洲精品国产| 欧美日韩福利在线观看| 日本精品免费在线观看| 国产狼人综合免费视频| 国产精品女视频| 奇米888一区二区三区| 7777精品久久久久久| 欧美精品国产精品日韩精品| 欧美日韩一区综合| 国产传媒欧美日韩| 中文字幕免费高| 国产一区二区三区四区五区在线| 日韩中文综合网| 日韩中文字幕三区| 成人国产精品一区二区| 欧美成在线观看| 欧美另类一区| 国产精品.com| 亚洲一区亚洲二区亚洲三区| 国产美女99p| 欧美精品在线免费| 国产综合欧美在线看| 国产精品-区区久久久狼| 韩国精品一区二区三区六区色诱| 99久久免费观看| 国产精品免费小视频| 日韩中文不卡| 国产伦精品一区二区| 日韩视频永久免费观看| 亚洲精品国产精品久久| 国产一级大片免费看| 国产成人在线小视频| 九九热r在线视频精品| 欧美在线免费视频| 成人动漫在线观看视频| 国产精品黄色影片导航在线观看| 日韩小视频在线播放| 97精品久久久中文字幕免费| 欧美成人精品在线| 黄色一区三区| 日韩一中文字幕|