forecast satellite outages will not result in a loss of navigation coverage (i.e. the capability to determine
position) on any part of the specified route of flight. If such outages are detected by the programme, the
flight will need to be re-routed, delayed or cancelled.
Determination of the Availability of RAIM
8.3.13 Once the position determination function is assured (i.e. no loss in navigation coverage for
the route has been predicted), the operator must run the RAIM outage prediction programme. Any
continuous outage of RAIM capability of greater than 51 minutes in MNPS airspace means again that the
flight should be re-routed, delayed or cancelled. It is understood that some prediction programmes carry out
both these checks together.
Note - Derivation of the 51 minute limit – At the instant the RAIM capability is lost, it is assumed
that the GPS navigation solution proceeds to direct the aircraft away from track at a speed
of 35 knots. With the current MNPS track spacing of 60 nautical miles, it is further assumed
that aircraft on adjacent tracks have a lateral “safety buffer” of 30 nautical miles. At 35
knots it will take an aircraft 51 minutes to exit this “safety buffer”. It should be noted that
this is a very conservative methodology and it is thought unlikely that a RAIM outage alone
could cause such errant navigation behaviour.
Loading of Initial Waypoints
8.3.14 The manual entry of waypoint data into the navigation systems must be a co-ordinated
operation by two persons, working in sequence and independently: one should key in and insert the data,
and subsequently the other should recall it and confirm it against source information. It is not sufficient for
one crew member just to observe or assist another crew member inserting the data.
8.3.15 The ramp position of the aircraft, plus at least two additional waypoints, or, if the onboard
equipment allows, all the waypoints relevant to the flight, should be loaded while the aircraft is at the ramp.
However, it is more important initially to ensure that the first en route waypoint is inserted accurately.
Note - The vast majority of commercial air transport aircraft operating in MNPS airspace have an
IRS/INS as part of their Long Range navigation fit. An increasing number of those with IRS/INS also
have GPS and whilst GPS may then be considered the primary LRNS, these aircraft are still required
to input the ramp position. This should then be compared with the GPS solution. For those few
aircraft with GPS as the only LRNS, whilst there may be no need to actually load the ramp position,
it is good airmanship and recommended operational practice to compare the published ramp
position with the GPS-derived position. Without selective availability GPS should give a position
NORTH ATLANTIC MNPSA OPERATIONS MANUAL CHAPTER 8
NAT MNPS 46 Edition 2005
within 30 metres of the published ramp position. If the GPS position is more than 100 metres from
the published ground position, then the cause should be investigated. If sufficient satellites are in
view the most likely causes are GPS receiver error, atmospheric interference, or, incorrect ramp coordinates.
8.3.16 During flight, at least two current waypoints beyond the leg being navigated should be
maintained in the Control Display Units (CDUs) until the destination ramp co-ordinates are loaded. Two
pilots should be responsible for loading, recalling and checking the accuracy of the inserted waypoints; one
loading and the other subsequently recalling and checking them independently. However, this process
should not be permitted to engage the attention of both pilots simultaneously during the flight. Where
remote loading of the units is possible, this permits one pilot to cross-check that the data inserted
automatically is indeed accurate.
8.3.17 An alternative and acceptable procedure is for the two pilots silently and independently to
load their own initial waypoints and then cross-check them. The pilot responsible for carrying out the
verification should work from the CDU display to the Master Document rather than in the opposite direction.
This may lessen the risk of the pilot 'seeing what is expected to be seen’ rather than what is actually
displayed.
Flight Plan Check
8.3.18 The purpose of this check is to ensure complete compatibility between the data in the Master
Document and the calculated output from the navigation systems. Typical actions could include:
• checking the distance from the ramp position to the first waypoint. Some systems will account for
the track distance involved in an ATC SID; in others, an appropriate allowance for a SID may have
to be made to the great circle distance indicated in order to match that in the Master Document. If
 
中國航空網(wǎng) www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:航空資料35(84)
国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
国产精品99久久99久久久二8| 色婷婷久久一区二区| 久久久亚洲网站| 九九精品在线播放| 国模视频一区二区| 久久久久久免费看| 欧美一区二区高清在线观看| 99在线首页视频| 欧美激情二区三区| 国产欧美一区二区三区久久| 日韩专区在线观看| 日韩精品另类天天更新| 久久久中文字幕| 欧美一区二区三区精美影视 | 国产黄视频在线| 亚洲国产日韩美| 91精品国产高清久久久久久91| 亚洲中文字幕无码不卡电影| 成人免费在线网址| 亚洲综合av影视| 国产精品自产拍在线观看中文| 久久中文精品视频| 国产欧美日韩免费| 欧美激情图片区 | 麻豆乱码国产一区二区三区| 国自在线精品视频| 久久电影一区二区| 国产乱码精品一区二区三区日韩精品 | 成人av在线不卡| 中文字幕免费高| 产国精品偷在线| 亚洲一区二区三区香蕉| 91九色丨porny丨国产jk| 亚洲不卡中文字幕| 国产福利久久精品| 青青草国产精品| 国产精品久久久久久久午夜| 激情五月亚洲色图| 欧美大胆在线视频| 成人h在线播放| 亚洲黄色一区二区三区| 久久精品女人的天堂av| 欧美一级成年大片在线观看| 国产精品人人做人人爽| 国产日韩欧美综合| 亚洲精品中文字幕在线| 久久久久久久久久久人体| 欧美极品欧美精品欧美| 久久91亚洲精品中文字幕| 97精品一区二区三区| 日本欧美在线视频| 国产精品美女久久| 91久久精品视频| 欧美性视频在线| 精品国产乱码一区二区三区四区| 国产噜噜噜噜久久久久久久久| 无码播放一区二区三区| 久久精品2019中文字幕| 免费观看美女裸体网站| 亚洲一区二区久久久久久| 日韩在线免费观看视频| 国产裸体舞一区二区三区| 欧美一区二区视频17c| 久久精品99国产精品酒店日本| 国产在线一区二区三区四区| 无码免费一区二区三区免费播放| 国产精品视频播放| 91免费版网站入口| 欧美精品卡一卡二| 亚洲综合av影视| 久久免费精品视频| 蜜桃麻豆91| 三区精品视频观看| 久久777国产线看观看精品| 久久国产精品久久精品国产| 国产偷人视频免费| 日韩激情久久| 一卡二卡三卡视频| 久久久精品视频在线观看| 国产精品一码二码三码在线| 日韩免费黄色av| 亚洲在线第一页| 久久亚洲国产成人| 日韩在线视频线视频免费网站| 成人精品视频99在线观看免费| 日韩精品一区二区三区外面| 欧美激情综合色| 久久人人爽人人爽爽久久| 久久久com| 阿v天堂2017| 国产主播在线看| 欧美久久在线| 日本午夜一区二区三区| 伊人色综合久久天天五月婷| 国产精品男人爽免费视频1| 国产成人一区三区| 91精品久久久久久| 成人免费91在线看| 国产免费观看高清视频| 国内揄拍国内精品少妇国语| 日本午夜精品电影| 亚洲第一精品区| 亚洲三级一区| 一区二区视频在线播放| 国产精品后入内射日本在线观看| 日韩在线不卡视频| 久久久久天天天天| 久久久免费观看| 91精品在线影院| av动漫在线免费观看| 隔壁老王国产在线精品| 国产欧美一区二区三区视频| 免费观看亚洲视频| 国内精品伊人久久| 精品视频一区二区在线| 欧美丰满熟妇xxxxx| 欧美亚洲精品一区二区| 青青青青在线视频| 欧美专区第一页| 欧美亚洲在线观看| 欧美日韩一区二区三区免费| 极品美女扒开粉嫩小泬| 免费看欧美一级片| 国产在线一区二区三区欧美| 国产专区欧美专区| 国产三区精品| 国产精品永久免费| www.av一区视频| 91高清免费视频| 久久男人资源站| 国产成一区二区| 日日摸夜夜添一区| 国产精品美女网站| 精品自拍视频在线观看| 曰韩不卡视频| 色综合久久av| 欧美一区少妇| 精品无码av无码免费专区| 国产欧美日韩丝袜精品一区| 不卡一区二区三区视频| 国产精品69久久久| 久久久久综合一区二区三区| 久久精品国产成人| 国产精品欧美久久久| 欧美精品免费在线观看| 久久99久久亚洲国产| 亚洲精品一区二区三区av| 欧美一级淫片播放口| 欧美在线一区视频| 欧美国产激情视频| 国产综合免费视频| 成人毛片100部免费看| 国产高清自拍99| 久久精品亚洲一区| 欧美激情va永久在线播放| 亚洲激情电影在线| 欧美尤物巨大精品爽| 国产日产亚洲精品| 91九色丨porny丨国产jk| 日韩中文字幕在线精品| 久久香蕉频线观| 宅男av一区二区三区| 日日噜噜夜夜狠狠久久丁香五月 | 久久久久久国产精品免费免费| www.色综合| 中文字幕成人一区| 日韩精品不卡| 国产区一区二区| 国产成+人+综合+亚洲欧洲| 国产精品久久一区主播| 亚洲欧洲日韩精品| 日韩精品极品视频在线观看免费| 国产日韩欧美91| 国产成人极品视频| 国产精品成人v| 欧美一区二区大胆人体摄影专业网站 | 欧洲精品久久| 国产精品亚洲综合天堂夜夜| 久久精品综合一区| 亚洲精品国产精品国自产观看| 少妇精品久久久久久久久久| 久艹在线免费观看| 久久成人免费视频| 日本伊人精品一区二区三区介绍| 激情小说综合区| 岛国视频一区| 国产一区玩具在线观看| 久久手机在线视频| 国产精品高潮粉嫩av| 无码少妇一区二区三区芒果| 精品一区二区国产| 久久精品无码中文字幕| 最新不卡av| 欧美这里只有精品| 97激碰免费视频| 久久香蕉国产线看观看av| 亚洲免费视频播放| 欧美黄色直播| 国产a级黄色大片| 一区二区免费在线视频|