国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽

  • 熱門標簽

當前位置: 主頁 > 航空資料 > 國外資料 >

時間:2010-09-06 00:51來源:藍天飛行翻譯 作者:admin
曝光臺 注意防騙 網曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費者

forecast satellite outages will not result in a loss of navigation coverage (i.e. the capability to determine
position) on any part of the specified route of flight. If such outages are detected by the programme, the
flight will need to be re-routed, delayed or cancelled.
Determination of the Availability of RAIM
8.3.13 Once the position determination function is assured (i.e. no loss in navigation coverage for
the route has been predicted), the operator must run the RAIM outage prediction programme. Any
continuous outage of RAIM capability of greater than 51 minutes in MNPS airspace means again that the
flight should be re-routed, delayed or cancelled. It is understood that some prediction programmes carry out
both these checks together.
Note - Derivation of the 51 minute limit – At the instant the RAIM capability is lost, it is assumed
that the GPS navigation solution proceeds to direct the aircraft away from track at a speed
of 35 knots. With the current MNPS track spacing of 60 nautical miles, it is further assumed
that aircraft on adjacent tracks have a lateral “safety buffer” of 30 nautical miles. At 35
knots it will take an aircraft 51 minutes to exit this “safety buffer”. It should be noted that
this is a very conservative methodology and it is thought unlikely that a RAIM outage alone
could cause such errant navigation behaviour.
Loading of Initial Waypoints
8.3.14 The manual entry of waypoint data into the navigation systems must be a co-ordinated
operation by two persons, working in sequence and independently: one should key in and insert the data,
and subsequently the other should recall it and confirm it against source information. It is not sufficient for
one crew member just to observe or assist another crew member inserting the data.
8.3.15 The ramp position of the aircraft, plus at least two additional waypoints, or, if the onboard
equipment allows, all the waypoints relevant to the flight, should be loaded while the aircraft is at the ramp.
However, it is more important initially to ensure that the first en route waypoint is inserted accurately.
Note - The vast majority of commercial air transport aircraft operating in MNPS airspace have an
IRS/INS as part of their Long Range navigation fit. An increasing number of those with IRS/INS also
have GPS and whilst GPS may then be considered the primary LRNS, these aircraft are still required
to input the ramp position. This should then be compared with the GPS solution. For those few
aircraft with GPS as the only LRNS, whilst there may be no need to actually load the ramp position,
it is good airmanship and recommended operational practice to compare the published ramp
position with the GPS-derived position. Without selective availability GPS should give a position
NORTH ATLANTIC MNPSA OPERATIONS MANUAL CHAPTER 8
NAT MNPS 46 Edition 2005
within 30 metres of the published ramp position. If the GPS position is more than 100 metres from
the published ground position, then the cause should be investigated. If sufficient satellites are in
view the most likely causes are GPS receiver error, atmospheric interference, or, incorrect ramp coordinates.
8.3.16 During flight, at least two current waypoints beyond the leg being navigated should be
maintained in the Control Display Units (CDUs) until the destination ramp co-ordinates are loaded. Two
pilots should be responsible for loading, recalling and checking the accuracy of the inserted waypoints; one
loading and the other subsequently recalling and checking them independently. However, this process
should not be permitted to engage the attention of both pilots simultaneously during the flight. Where
remote loading of the units is possible, this permits one pilot to cross-check that the data inserted
automatically is indeed accurate.
8.3.17 An alternative and acceptable procedure is for the two pilots silently and independently to
load their own initial waypoints and then cross-check them. The pilot responsible for carrying out the
verification should work from the CDU display to the Master Document rather than in the opposite direction.
This may lessen the risk of the pilot 'seeing what is expected to be seen’ rather than what is actually
displayed.
Flight Plan Check
8.3.18 The purpose of this check is to ensure complete compatibility between the data in the Master
Document and the calculated output from the navigation systems. Typical actions could include:
• checking the distance from the ramp position to the first waypoint. Some systems will account for
the track distance involved in an ATC SID; in others, an appropriate allowance for a SID may have
to be made to the great circle distance indicated in order to match that in the Master Document. If
 
中國航空網 www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:航空資料35(84)
国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
久久久神马电影| 蜜桃视频成人| 欧美做受高潮1| 国产伦精品一区二区三毛| 国产成人avxxxxx在线看| 国产精品情侣自拍| 日韩中文不卡| 国产在线青青草| 久久久久久久国产精品| 欧美激情视频网址| 日韩中文不卡| 成人a级免费视频| 国产精品视频网| 日本不卡一区二区三区视频| 国产情侣第一页| 久久99精品久久久久久青青日本 | 人人妻人人添人人爽欧美一区 | 成人av在线亚洲| 久久成人精品视频| 日韩五码在线观看| 99国产精品久久久久老师| 欧美成人在线影院| 欧美久久综合性欧美| 色黄久久久久久| 日日橹狠狠爱欧美超碰| 国产精品一区二区你懂得| 久久不射电影网| 美乳视频一区二区| 国产精品视频永久免费播放| 日韩欧美精品在线不卡| 国产z一区二区三区| 视频一区三区| 国产精欧美一区二区三区| 一区二区免费在线观看| 精品午夜一区二区三区| 日韩在线观看免费| 热re99久久精品国产66热| 国产成人精品久久| 日韩亚洲一区在线播放| 久久久久久久久久久久久久国产 | 欧美自拍视频在线观看| 久久久久久久国产精品| 日本高清+成人网在线观看| 久久男人av资源网站| 中文字幕无码精品亚洲资源网久久| 精品视频在线观看| 国产精品免费入口| 国产综合第一页| 欧美激情久久久久| 97久久久免费福利网址| 亚洲精品日韩成人| 国产成人a亚洲精v品无码| 日韩欧美在线电影| 精品国产欧美成人夜夜嗨| 欧美日韩dvd| 国产精品第12页| 国产美女网站在线观看| 亚洲人成网站在线播放2019| 久久人妻精品白浆国产| 亚洲国产精品久久久久爰色欲 | 一道本在线观看视频| 99国产精品久久久久老师| 午夜啪啪福利视频| 国产不卡在线观看| 热re99久久精品国产99热| 久艹在线免费观看| 激情综合网婷婷| 蜜月aⅴ免费一区二区三区| 粉嫩高清一区二区三区精品视频| 亚洲精品成人a8198a| 久久久久欧美| 韩国成人一区| 色综合视频网站| 88国产精品欧美一区二区三区| 欧美一级免费看| 精品国内产的精品视频在线观看| 国产在线拍偷自揄拍精品| 中文字幕一区综合| 91免费的视频在线播放| 欧洲精品久久久| 国产精品视频1区| 国产精品亚洲a| 日韩视频在线观看国产| 欧美成人精品在线| 国产成人精品日本亚洲专区61| 免费看污久久久| 无码人妻h动漫| 国产精品美女av| 91九色国产视频| 蜜桃网站成人| 午夜久久久久久久久久久| 国产成人午夜视频网址| 高清一区二区三区日本久| 日韩av色在线| 中文字幕一区二区三区最新| www.xxxx精品| 国产精品一区久久| 欧美一区亚洲二区| 亚洲综合视频1区| 国产精品视频一二三四区| 国产精品av免费在线观看| 日韩.欧美.亚洲| 欧美激情亚洲国产| 久久久999国产| 91精品国产91久久久| 国内外免费激情视频| 欧美一级免费在线观看| 久久99精品久久久久久青青91| 91av在线国产| 国产精品夜色7777狼人| 欧美不卡福利| 亚洲a级在线观看| 久久99精品久久久久久噜噜| 国产成人精品优优av| 久久久免费观看| 国内精品久久久久伊人av| 日韩不卡一二区| 国产精品久久久久久久久久久久冷| 亚洲一区二区三区在线免费观看| 欧美成人精品一区二区三区| 国产精品区二区三区日本| 久久精品国产96久久久香蕉| 久久久精品亚洲| 色噜噜狠狠狠综合曰曰曰88av| 日韩在线观看你懂的| 国产成人a亚洲精品| 91免费看片网站| 久久久视频在线| 久久国产日韩欧美| 久久久久久久久网站| www.xxxx精品| 国产精品久久久久影院日本| 欧美成aaa人片免费看| 欧美成人第一页| 正在播放国产精品| 曰韩不卡视频| 亚洲精品一区二区三区蜜桃久| 大地资源第二页在线观看高清版| 视频在线一区二区三区| 日韩欧美视频一区二区三区四区| 青青在线免费观看| 欧美一级爱爱| 麻豆av免费在线| 粉嫩av四季av绯色av第一区| 久久久伊人欧美| www.欧美免费| 九九九久久国产免费| 亚洲精品视频一二三| 日本久久久久久久久久久| 欧美激情一区二区三区在线视频| 国产在线精品成人一区二区三区| 成人精品一区二区三区电影免费| 91精品国产91久久久久久| 日韩视频中文字幕| 久久成年人视频| 午夜精品一区二区在线观看| 日韩亚洲在线视频| 精品视频一区二区在线| 97久久天天综合色天天综合色hd| 日韩一区二区av| 欧美精品成人91久久久久久久| 日日摸天天爽天天爽视频| 精品欧美一区二区三区久久久 | 国产乱子伦精品| 国产ts一区二区| 久久亚洲精品小早川怜子66| 亚洲专区在线视频| 日韩精品一区二区免费| 国产资源第一页| 68精品久久久久久欧美| 国产精品久久久久久一区二区| 亚洲高清在线观看一区| 好吊色欧美一区二区三区四区| 99爱精品视频| 国产精品久久久91| 视频一区国产精品| 国产综合精品一区二区三区| 国产精品99一区| 精品中文字幕视频| 日韩免费一级视频| 成人国产精品日本在线| 色狠狠av一区二区三区香蕉蜜桃| 一区二区日本伦理| 激情六月天婷婷| 114国产精品久久免费观看| 国产精品久久久久久久美男| 午夜啪啪福利视频| 国产最新免费视频| 久久久久女教师免费一区| 一区二区欧美日韩| 激情图片qvod| 久久精品国产第一区二区三区最新章节 | 777精品视频| 国产精品福利视频| 日韩欧美一区二区三区四区| 成人www视频在线观看| 国产精品欧美激情在线播放| 日韩av一区二区三区在线观看 | 午夜免费福利小电影| 国产区精品视频|