国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽

  • 熱門標簽

當前位置: 主頁 > 航空資料 > 國外資料 >

時間:2010-05-10 19:29來源:藍天飛行翻譯 作者:admin
曝光臺 注意防騙 網曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費者

made to the flight plan en route due to deteriorating
weather, the dispatcher will maintain contact with the
flight crew and will reroute their flight as necessary.
Therefore, it is the pilot’s responsibility to execute the
flight as planned by the dispatcher; this is especially true
for Part 121 pilots. To aid in the planning of alternates,
dispatchers have a list of airports that are approved as
alternates so they can quickly determine which airports
should be used for a particular flight. Dispatchers also
use flight-planning software that plans routes including
alternates for the flight. This type of software is tailored
for individual operators and includes their normal flight
paths and approved airports. Flight planning software
and services are provided through private sources.
Though the pilot is the final authority for the flight and
ultimately has full responsibility, the dispatcher is
responsible for creating flight plans that are accurate and
comply with the CFRs. Alternate minimum criteria are
only used as planning tools to ensure the pilot-in-command and dispatcher are thinking ahead to the approach
phase of flight. In the event the flight would actually
need to divert to an alternate, the published approach
minimums or lower-than-standard minimums must be
used as addressed in OpsSpecs documents.
DEPARTURE PROCEDURES
Departure procedures are preplanned routes that provide
transitions from the departure airport to the en route
structure. Primarily, these procedures are designed to
provide obstacle protection for departing aircraft. They
also allow for efficient routing of traffic and reductions
in pilot/controller workloads. These procedures come in
many forms, but they are all based on the design criteria
outlined in TERPS and other FAA orders. The A/FD
includes information on high altitude redesign RNAV
routing pitch points, preferred IFR routings, or other
established routing programs where a flight can begin a
segment of nonrestrictive routing.
DESIGN CRITERIA
The design of a departure procedure is based on TERPS,
a living document that is updated frequently. Departure
design criterion assumes an initial climb of 200 feet per
nautical mile (NM) after crossing the departure end of
the runway (DER) at a height of at least 35 feet. [Figure
2-15] The aircraft climb path assumption provides a
minimum of 35 feet of additional obstacle clearance
above the required obstacle clearance (ROC), from the
DER outward, to absorb variations ranging from the
distance of the static source to the landing gear, to differences in establishing the minimum 200 feet per NM
climb gradient, etc. The ROC is the planned separation
between the obstacle clearance surface (OCS) and the
required climb gradient of 200 feet per NM. The ROC
value is zero at the DER elevation and increases along
the departure route until the appropriate ROC value is
attained to allow en route flight to commence. It is
typically about 25 NM for 1,000 feet of ROC in nonmountainous areas, and 46 NM for 2,000 feet of ROC
in mountainous areas.
Recent changes in TERPS criteria make the OCS lower
and more restrictive. [Figure 2-16 on page 2-14]
However, there are many departures today that were
evaluated under the old criteria [Figure 2-15] that
allowed some obstacle surfaces to be as high as 35 feet
at the DER. Since there is no way for the pilot to determine whether the departure was evaluated using the
2-13
previous or current criteria and until all departures have
been evaluated using the current criteria, pilots need to
be very familiar with the departure environment and
associated obstacles especially if crossing the DER at
less than 35 feet.
Assuming a 200-foot per NM climb, the departure is
structured to provide at least 48 feet per NM of clearance above objects that do not penetrate the obstacle
slope. The slope, known as the OCS, is based on a 40 to
1 ratio, which is the equivalent of a 2.5 percent or a 152-
foot per NM slope. As a result, a departure is designed
using the OCS as the minimum obstacle clearance, and
then by requiring a minimum climb gradient of 200 feet
per NM, additional clearance is provided. The departure
design must also include the acquisition of positive
course guidance (PCG) typically within 5 to 10 NM of
the DER for straight departures and within 5 NM after
turn completion on departures requiring a turn. Even
when aircraft performance greatly exceeds the minimum
climb gradient, the published departure routing must
always be flown.
Airports declaring that the sections of a runway at one
 
中國航空網 www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:Instrument Procedures Handbook (IPH)儀表程序手冊下(44)
国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
国产精品12p| 国产欧美日韩免费| 欧美丰满熟妇xxxxx| 成人3d动漫一区二区三区| 久久久精品网站| 欧美一区二区激情| 成人在线免费观看一区| 久久成年人视频| 欧美资源在线观看| 久久久久免费精品| 日韩中文字幕组| 久久久欧美一区二区| 亚洲一区免费看| 国产在线精品一区免费香蕉| 色偷偷88888欧美精品久久久| 亚洲色欲久久久综合网东京热| 国产午夜精品视频一区二区三区| 久热精品视频在线| 欧美视频在线观看视频| 日韩中文字幕视频在线| 热久久99这里有精品| 日韩网站免费观看| 欧美日韩喷水| 久久久www成人免费精品| 欧美最猛性xxxxx亚洲精品| 久久本道综合色狠狠五月| 日韩欧美亚洲区| 日韩中文字幕精品| 欧洲成人一区二区| 国产精品十八以下禁看| 欧美极品欧美精品欧美| 国产精品久久..4399| 国产日韩精品在线| 中文字幕制服丝袜在线| www.中文字幕在线| 亚洲欧美日韩精品久久久| 久久久亚洲精选| 日韩亚洲不卡在线| www.久久久久| 美女视频久久| 欧美xxxx18国产| 97精品国产97久久久久久春色| 午夜精品理论片| 国产精品99久久久久久久久| 日韩在线三区| 国产精品视频一区二区三区四区五区| 激情综合网婷婷| 国产精品福利无圣光在线一区| 国产日韩精品一区二区| 亚洲午夜久久久影院伊人| 91国产中文字幕| 人妻无码视频一区二区三区 | 国产成人综合久久| 日韩欧美亚洲v片| 不卡中文字幕av| 97免费中文视频在线观看| 日本天堂免费a| 久久精品国产2020观看福利| 国产一区二区在线播放| 亚洲一区二区三区精品视频| 久久久久久国产免费| 国产欧美自拍视频| 欧美一区二区大胆人体摄影专业网站| 精品国产一区二区三区四区在线观看 | 精品国产一二三四区| 91av免费看| 精品欧美一区二区三区久久久| 国产精品久久97| 91精品久久久久久久| 茄子视频成人免费观看| 亚洲一区精品电影| 国产资源第一页| 亚洲人成无码www久久久| 91九色国产视频| 人妻少妇精品无码专区二区| 久久综合久久八八| 国产对白在线播放| 国产一区二区三区小说| 性一交一乱一伧国产女士spa | 精品国产一区二区三区日日嗨| 久久香蕉综合色| 国产一区二区丝袜高跟鞋图片| 午夜午夜精品一区二区三区文| 国产精品免费小视频| 91看片淫黄大片91| 国内精品视频一区| 手机看片福利永久国产日韩| 不卡中文字幕av| 色吧影院999| 91精品国产综合久久香蕉最新版| 国外色69视频在线观看| 日本一区二区三区视频在线播放 | 欧美日韩亚洲一| 五月天综合婷婷| 久久夜色撩人精品| 日韩中文理论片| 91精品在线一区| 国产日韩视频在线观看| 欧美专区第一页| 午夜精品久久久久久久久久久久久 | 性色av香蕉一区二区| 不卡av在线网站| 久久精品这里热有精品| 久久久999视频| av一本久道久久波多野结衣| 激情五月六月婷婷| 日本一区高清不卡| 亚洲国产一区二区在线| 久久99久久久久久久噜噜| 国产精品久久久久秋霞鲁丝| 久久超碰亚洲| 国产黄色特级片| www..com日韩| 国产精品一区二区性色av| 国产一区二区三区色淫影院| 欧美视频小说| 品久久久久久久久久96高清| 日韩国产精品一区二区三区| 色香蕉在线观看| 亚洲精品一区二区毛豆| 欧美精品久久一区二区| 九九热这里只有精品6| 国产精品第一页在线| 国产精品美女免费看| 久久深夜福利免费观看| 久久久国产视频91| 国产精品免费观看久久| 国产精品免费在线| 国产精品老女人精品视频| 国产精品日韩三级| 国产精品三级网站| 久久精品国产精品亚洲| 精品国产一区二区在线| 国产成人精品一区二区在线| 精品国产一区av| 国产精品美女呻吟| 欧美精品少妇videofree| 美日韩精品免费观看视频| 欧美成人精品在线观看| 欧美激情视频网站| 亚洲自拍欧美色图| 亚洲不卡中文字幕| 欧美一级在线看| 日韩男女性生活视频| 欧美精品一区二区三区久久| 国内精品久久久久久中文字幕| 黄黄视频在线观看| 国产一区二区四区| 91免费在线观看网站| 国产福利一区视频| 久久精品视频网站| 久久成人精品一区二区三区| 久久99精品久久久久久青青91| 一区二区视频国产| 午夜精品久久久久久久白皮肤| 色婷婷精品国产一区二区三区| 欧美综合一区第一页| 精品少妇人妻av一区二区| 国产欧美日韩网站| 久久久亚洲精品视频| 日韩少妇与小伙激情| 国产精品久久久久久久久久| 九九精品在线观看| 少妇高潮流白浆| 欧美久久久久久久久久久久久| 国产一区二区黄色| 91国产精品视频在线| 久久99欧美| 国产精品成久久久久三级| 欧美精品久久久久久久久久| 日韩av一区二区三区在线观看| 免费国产一区| 97欧洲一区二区精品免费| 日韩在线欧美在线国产在线| 伦理中文字幕亚洲| 三区精品视频| 欧美高清视频一区二区三区在线观看| 国产乱码精品一区二区三区中文| 久久伊人一区二区| 国产精品久久久久久久小唯西川| 亚洲欧洲精品在线观看| 欧美日韩一区综合| 97国产精品视频| 国产精品免费视频一区二区| 亚洲在线欧美| 欧美国产视频一区| 91免费国产网站| 国产精品久久久久久久久久新婚 | 国产自产在线视频| 国产成人在线亚洲欧美| 欧美成人一区二区三区电影| 欧美一区1区三区3区公司| 国产欧美一区二区三区不卡高清 | 久久99中文字幕| 一区二区不卡在线观看| 青青青在线视频播放| 成人免费91在线看| 国产精品久久av| 青草青草久热精品视频在线观看| 成人久久18免费网站漫画|