国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽

  • 熱門標簽

當前位置: 主頁 > 航空資料 > 國外資料 >

時間:2010-05-10 19:29來源:藍天飛行翻譯 作者:admin
曝光臺 注意防騙 網曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費者

made to the flight plan en route due to deteriorating
weather, the dispatcher will maintain contact with the
flight crew and will reroute their flight as necessary.
Therefore, it is the pilot’s responsibility to execute the
flight as planned by the dispatcher; this is especially true
for Part 121 pilots. To aid in the planning of alternates,
dispatchers have a list of airports that are approved as
alternates so they can quickly determine which airports
should be used for a particular flight. Dispatchers also
use flight-planning software that plans routes including
alternates for the flight. This type of software is tailored
for individual operators and includes their normal flight
paths and approved airports. Flight planning software
and services are provided through private sources.
Though the pilot is the final authority for the flight and
ultimately has full responsibility, the dispatcher is
responsible for creating flight plans that are accurate and
comply with the CFRs. Alternate minimum criteria are
only used as planning tools to ensure the pilot-in-command and dispatcher are thinking ahead to the approach
phase of flight. In the event the flight would actually
need to divert to an alternate, the published approach
minimums or lower-than-standard minimums must be
used as addressed in OpsSpecs documents.
DEPARTURE PROCEDURES
Departure procedures are preplanned routes that provide
transitions from the departure airport to the en route
structure. Primarily, these procedures are designed to
provide obstacle protection for departing aircraft. They
also allow for efficient routing of traffic and reductions
in pilot/controller workloads. These procedures come in
many forms, but they are all based on the design criteria
outlined in TERPS and other FAA orders. The A/FD
includes information on high altitude redesign RNAV
routing pitch points, preferred IFR routings, or other
established routing programs where a flight can begin a
segment of nonrestrictive routing.
DESIGN CRITERIA
The design of a departure procedure is based on TERPS,
a living document that is updated frequently. Departure
design criterion assumes an initial climb of 200 feet per
nautical mile (NM) after crossing the departure end of
the runway (DER) at a height of at least 35 feet. [Figure
2-15] The aircraft climb path assumption provides a
minimum of 35 feet of additional obstacle clearance
above the required obstacle clearance (ROC), from the
DER outward, to absorb variations ranging from the
distance of the static source to the landing gear, to differences in establishing the minimum 200 feet per NM
climb gradient, etc. The ROC is the planned separation
between the obstacle clearance surface (OCS) and the
required climb gradient of 200 feet per NM. The ROC
value is zero at the DER elevation and increases along
the departure route until the appropriate ROC value is
attained to allow en route flight to commence. It is
typically about 25 NM for 1,000 feet of ROC in nonmountainous areas, and 46 NM for 2,000 feet of ROC
in mountainous areas.
Recent changes in TERPS criteria make the OCS lower
and more restrictive. [Figure 2-16 on page 2-14]
However, there are many departures today that were
evaluated under the old criteria [Figure 2-15] that
allowed some obstacle surfaces to be as high as 35 feet
at the DER. Since there is no way for the pilot to determine whether the departure was evaluated using the
2-13
previous or current criteria and until all departures have
been evaluated using the current criteria, pilots need to
be very familiar with the departure environment and
associated obstacles especially if crossing the DER at
less than 35 feet.
Assuming a 200-foot per NM climb, the departure is
structured to provide at least 48 feet per NM of clearance above objects that do not penetrate the obstacle
slope. The slope, known as the OCS, is based on a 40 to
1 ratio, which is the equivalent of a 2.5 percent or a 152-
foot per NM slope. As a result, a departure is designed
using the OCS as the minimum obstacle clearance, and
then by requiring a minimum climb gradient of 200 feet
per NM, additional clearance is provided. The departure
design must also include the acquisition of positive
course guidance (PCG) typically within 5 to 10 NM of
the DER for straight departures and within 5 NM after
turn completion on departures requiring a turn. Even
when aircraft performance greatly exceeds the minimum
climb gradient, the published departure routing must
always be flown.
Airports declaring that the sections of a runway at one
 
中國航空網 www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:Instrument Procedures Handbook (IPH)儀表程序手冊下(44)
国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
少妇高清精品毛片在线视频| 欧美激情亚洲自拍| 蜜桃传媒一区二区| 国内精品久久久久久影视8| 青青草免费在线视频观看| 亚洲精品一品区二品区三品区| 亚洲熟妇无码一区二区三区| 亚洲欧洲中文| 日本精品久久久久久久| 青青在线免费观看| 欧美精品一区二区三区四区五区| 欧美连裤袜在线视频| 毛葺葺老太做受视频| 国产日韩在线播放| www国产无套内射com| 91国产丝袜在线放| 久久久久久久久国产精品| 国产成人精品一区二区三区福利| 国产精品天天av精麻传媒| 欧美成人免费在线观看| 欧美区二区三区| 懂色一区二区三区av片| 日韩精品国内| 国产免费久久av| 91精品国产91久久久久久最新| 久久福利一区二区| 国产精品成人va在线观看| 亚洲国产精品综合| 欧美日韩国产不卡在线看| 国产中文字幕视频在线观看| 99热在线这里只有精品| 久久久久久久久久久久久国产精品 | 91精品在线观| 久久精品国亚洲| 欧美精品激情在线| 人妻久久久一区二区三区| 国产人妖伪娘一区91| 国产成人精品视| 蜜月aⅴ免费一区二区三区 | 欧美中文字幕在线视频| 国产亚洲精品自在久久| 国产精品 欧美在线| 国产精品久久国产三级国电话系列| 亚洲最大福利视频| 免费精品视频一区| 国产精品99免视看9| 国产精品高清在线观看| 色香蕉在线观看| 国产美女精品视频| 精品国产网站地址| 无码人妻精品一区二区蜜桃网站 | 久国内精品在线| 日本不卡二区| 99久久自偷自偷国产精品不卡| 国产精品天天av精麻传媒| 日韩av电影在线免费播放| 国产偷人视频免费| 日韩中文字幕在线播放| 亚洲成人午夜在线| 国产欧美日韩视频一区二区三区| 久久99影院| 亚洲精蜜桃久在线| 国产欧美日韩亚洲| 国产精品久久久久久网站| 日本十八禁视频无遮挡| 99在线观看| 一区二区传媒有限公司| 国产天堂在线播放| 国产精品乱码视频| 深夜福利91大全| 日本中文字幕一级片| 91免费黄视频| 精品成在人线av无码免费看| 欧美成人一区二区在线| 日韩中文在线视频| 欧美一区二区大胆人体摄影专业网站| 国产精品又粗又长| 久久这里只有精品99| 欧美变态另类刺激| 久久精品国产一区| 欧美人与性禽动交精品| 精品国偷自产在线视频99| 日韩精品久久久| 久久久久久久久久久久久久久久久久av | 亚洲国产日韩综合一区| 国产精品永久免费观看| 久久国产精品电影| 免费看a级黄色片| 久久成人精品视频| 国产一区喷水| 久久亚洲电影天堂| 黄色一级一级片| 国产精品国产精品| 国产欧美精品日韩精品| 欧美激情视频在线| 国产伦精品一区二区三区四区视频_ | 国产精品日韩精品| 激情六月天婷婷| 久久成年人免费电影| 国产免费黄视频| 一区二区三区电影| 久久精品午夜一区二区福利| 日韩久久不卡| 国产精品果冻传媒潘| 国产日韩一区欧美| 一道本在线观看视频| 成人av影视在线| 亚洲精品国产精品国自产 | 在线免费一区| 久久综合一区| 欧美亚洲另类在线一区二区三区| 久久久久北条麻妃免费看| 欧美精品尤物在线| 欧美xxxx14xxxxx性爽| 97国产精品视频| 人妻无码久久一区二区三区免费 | 国产一区在线免费观看| 亚洲综合自拍一区| 久久久久久久久久久久久国产 | 亚洲a级在线播放观看| 国产va亚洲va在线va| 男人天堂新网址| 在线精品亚洲一区二区| 久久久久久久久久久一区| 国产在线青青草| 欧美一区二区高清在线观看| 国产精品露出视频| 99精彩视频| 欧美日韩精品一区| 亚洲一区免费看| 久久久久久久电影一区| 蜜桃传媒一区二区| 亚洲高清视频一区| 国产精品欧美风情| 国产精品∨欧美精品v日韩精品| 欧美国产视频在线观看| 一区二区三区av| www欧美日韩| 不卡日韩av| 免费国产在线精品一区二区三区| 亚洲精品不卡| 国产精品久久久久久久av电影| 97精品免费视频| 国产中文字幕亚洲| 日韩人妻一区二区三区蜜桃视频| 蜜臀久久99精品久久久久久宅男| 久久久久久久久久亚洲| 国产精品一区av| 黄色www网站| 日韩高清专区| 亚洲国产精品久久久久久女王| 国产精品视频免费在线| 国产黄色激情视频| 国产精品亚洲二区在线观看| 欧美 日韩 国产在线| 日韩av日韩在线观看| 一本一本a久久| 精品国产乱码一区二区三区四区| 久久久久久一区| 久久涩涩网站| aaa毛片在线观看| 国产在线视频不卡| 欧美牲交a欧美牲交aⅴ免费真| 午夜免费久久久久| 亚洲最大成人在线| 欧美激情中文字幕在线| 国产精品免费视频一区二区| 日韩一区二区在线视频| 久久精品一区二区三区不卡免费视频 | 国产成人在线播放| 99久久精品免费看国产四区| 国产欧美久久久久| 国产三区精品| 国产日韩欧美自拍| 激情视频综合网| 欧美精品七区| 欧美精品久久久久久久免费| 日韩精品一区二区三区色欲av| 日韩av电影在线播放| 日韩一区二区三区资源| 五月天在线免费视频| 亚洲精品在线观看免费| 亚洲一区二区三区欧美| 亚洲综合成人婷婷小说| 亚洲专区国产精品| 亚洲一区二区三区毛片| 亚洲**2019国产| 日韩av大全| 日本午夜人人精品| 日韩videos| 日韩精品久久久毛片一区二区| 日本黄网站免费| 欧美资源一区| 精品人伦一区二区三区| 蜜桃免费区二区三区| 国产精品自产拍在线观看中文| 成人免费无码av| 久久欧美在线电影| zzjj国产精品一区二区| 国产精品成人观看视频国产奇米|