国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽

  • 熱門標簽

當前位置: 主頁 > 航空資料 > 國外資料 >

時間:2010-05-10 19:29來源:藍天飛行翻譯 作者:admin
曝光臺 注意防騙 網曝天貓店富美金盛家居專營店坑蒙拐騙欺詐消費者

made to the flight plan en route due to deteriorating
weather, the dispatcher will maintain contact with the
flight crew and will reroute their flight as necessary.
Therefore, it is the pilot’s responsibility to execute the
flight as planned by the dispatcher; this is especially true
for Part 121 pilots. To aid in the planning of alternates,
dispatchers have a list of airports that are approved as
alternates so they can quickly determine which airports
should be used for a particular flight. Dispatchers also
use flight-planning software that plans routes including
alternates for the flight. This type of software is tailored
for individual operators and includes their normal flight
paths and approved airports. Flight planning software
and services are provided through private sources.
Though the pilot is the final authority for the flight and
ultimately has full responsibility, the dispatcher is
responsible for creating flight plans that are accurate and
comply with the CFRs. Alternate minimum criteria are
only used as planning tools to ensure the pilot-in-command and dispatcher are thinking ahead to the approach
phase of flight. In the event the flight would actually
need to divert to an alternate, the published approach
minimums or lower-than-standard minimums must be
used as addressed in OpsSpecs documents.
DEPARTURE PROCEDURES
Departure procedures are preplanned routes that provide
transitions from the departure airport to the en route
structure. Primarily, these procedures are designed to
provide obstacle protection for departing aircraft. They
also allow for efficient routing of traffic and reductions
in pilot/controller workloads. These procedures come in
many forms, but they are all based on the design criteria
outlined in TERPS and other FAA orders. The A/FD
includes information on high altitude redesign RNAV
routing pitch points, preferred IFR routings, or other
established routing programs where a flight can begin a
segment of nonrestrictive routing.
DESIGN CRITERIA
The design of a departure procedure is based on TERPS,
a living document that is updated frequently. Departure
design criterion assumes an initial climb of 200 feet per
nautical mile (NM) after crossing the departure end of
the runway (DER) at a height of at least 35 feet. [Figure
2-15] The aircraft climb path assumption provides a
minimum of 35 feet of additional obstacle clearance
above the required obstacle clearance (ROC), from the
DER outward, to absorb variations ranging from the
distance of the static source to the landing gear, to differences in establishing the minimum 200 feet per NM
climb gradient, etc. The ROC is the planned separation
between the obstacle clearance surface (OCS) and the
required climb gradient of 200 feet per NM. The ROC
value is zero at the DER elevation and increases along
the departure route until the appropriate ROC value is
attained to allow en route flight to commence. It is
typically about 25 NM for 1,000 feet of ROC in nonmountainous areas, and 46 NM for 2,000 feet of ROC
in mountainous areas.
Recent changes in TERPS criteria make the OCS lower
and more restrictive. [Figure 2-16 on page 2-14]
However, there are many departures today that were
evaluated under the old criteria [Figure 2-15] that
allowed some obstacle surfaces to be as high as 35 feet
at the DER. Since there is no way for the pilot to determine whether the departure was evaluated using the
2-13
previous or current criteria and until all departures have
been evaluated using the current criteria, pilots need to
be very familiar with the departure environment and
associated obstacles especially if crossing the DER at
less than 35 feet.
Assuming a 200-foot per NM climb, the departure is
structured to provide at least 48 feet per NM of clearance above objects that do not penetrate the obstacle
slope. The slope, known as the OCS, is based on a 40 to
1 ratio, which is the equivalent of a 2.5 percent or a 152-
foot per NM slope. As a result, a departure is designed
using the OCS as the minimum obstacle clearance, and
then by requiring a minimum climb gradient of 200 feet
per NM, additional clearance is provided. The departure
design must also include the acquisition of positive
course guidance (PCG) typically within 5 to 10 NM of
the DER for straight departures and within 5 NM after
turn completion on departures requiring a turn. Even
when aircraft performance greatly exceeds the minimum
climb gradient, the published departure routing must
always be flown.
Airports declaring that the sections of a runway at one
 
中國航空網 www.k6050.com
航空翻譯 www.aviation.cn
本文鏈接地址:Instrument Procedures Handbook (IPH)儀表程序手冊下(44)
国产男女无遮挡_日本在线播放一区_国产精品黄页免费高清在线观看_国产精品爽爽爽
国产又粗又猛又爽又黄的网站| 欧美日韩成人精品| 亚洲欧美日韩在线综合| 97久久精品午夜一区二区| 一区二区高清视频| av无码久久久久久不卡网站| 亚洲精品欧美日韩专区| 91国产在线精品| 日韩av在线第一页| 国产成人精品无码播放| 国内一区二区在线视频观看| 欧美精品在线第一页| 成人伊人精品色xxxx视频| 久久91亚洲精品中文字幕| 国产精品一区二区免费| 天天人人精品| 国产精品日本一区二区| 国产精品一区二区免费看| 亚洲精品国产一区| 久久久久久尹人网香蕉| 免费观看精品视频| 一区二区不卡在线| 国产激情片在线观看| 欧美老熟妇喷水| 一区二区三区国产福利| 国产二区视频在线| 免费一级特黄特色毛片久久看| 一区二区视频在线播放| 久久涩涩网站| 黄色免费福利视频| 亚洲一区二区三区视频| xxx一区二区| 国产精品亚洲不卡a| 日韩精品福利片午夜免费观看| 操人视频在线观看欧美| 久久久福利视频| 国产一区二区在线播放| 天天夜碰日日摸日日澡性色av| 日韩中文字幕视频在线观看| 国产欧美久久久久| 欧美一级日本a级v片| 国产精品久久国产| 久久涩涩网站| 国产天堂在线播放| 日韩激情免费视频| 宅男噜噜99国产精品观看免费| 久久久久久亚洲精品中文字幕| 国产美女在线一区| 人人妻人人添人人爽欧美一区| 久久久久久18| 国产精品视频久久久| 久久男人av资源网站| 国产一区二区自拍| 日本精品久久久久中文字幕| 欧美成人午夜剧场免费观看| 国产超级av在线| 成人精品一区二区三区电影黑人| 人人妻人人澡人人爽欧美一区双| 精品国产成人av在线免| www.欧美三级电影.com| 成人欧美一区二区| 麻豆蜜桃91| 青青在线视频免费| 岛国视频一区免费观看| 欧美精品生活片| 精品国产一区二区三区四区在线观看 | 91精品国产99久久久久久| 蜜桃视频一区二区在线观看| 日本高清不卡三区| 亚洲国产日韩综合一区| 久久久久久12| 久久av中文字幕| 国产精品日韩一区二区免费视频 | 精品自拍视频在线观看| 国产成人啪精品视频免费网 | 国产精品免费区二区三区观看| 91久久夜色精品国产网站| 国产人妖伪娘一区91| 欧美日韩一区二区三区免费 | 亚洲aⅴ日韩av电影在线观看| 美女久久久久久久| 国产精品久久久久久久午夜| 国产成人生活片| 国产suv精品一区二区| 777午夜精品福利在线观看| 国产精品自产拍在线观| 国产淫片av片久久久久久| 欧美精品久久| 免费在线观看日韩视频| 品久久久久久久久久96高清| 奇米影视首页 狠狠色丁香婷婷久久综合| 熟妇人妻va精品中文字幕| 亚洲精品日韩av| 亚洲色成人一区二区三区小说| 伊人久久av导航| 一区一区视频| 亚洲欧美日韩精品在线| 亚洲精品中文字幕在线| 婷婷久久伊人| 日本a级片电影一区二区| 日韩女在线观看| 热草久综合在线| 欧洲日本亚洲国产区| 欧美在线免费视频| 欧美激情www| 黄色a级在线观看| 国产综合色香蕉精品| 国产一级不卡视频| 成人免费视频a| 国产精品99久久久久久久久久久久| 99久久国产免费免费| 久久综合狠狠综合久久综青草| 国产黄色一级网站| 日韩在线观看成人| 国产精品国产精品| 一区二区三区免费看| 亚洲欧美国产不卡| 久久久久国产精品一区| 国产aⅴ精品一区二区三区黄 | 国产aⅴ夜夜欢一区二区三区| 一区二区三区免费看| 无码无遮挡又大又爽又黄的视频| 欧美一级在线看| 欧美午夜欧美| 国产美女直播视频一区| 91精品国产91久久久久久最新| 久久久福利视频| 国产精品视频免费在线| 久久亚洲精品一区| 亚洲资源视频| 日本不卡视频在线播放| 黄色小视频大全| www.com毛片| 日韩色av导航| 精品久久久久久中文字幕动漫| 亚洲一区二区三区毛片| 欧美主播一区二区三区美女 久久精品人 | 日韩美女中文字幕| 国产欧美日韩中文| 91精品久久久久久| 国产成人精品在线| 色综合天天综合网国产成人网| 欧美一区二区视频17c| 欧美欧美一区二区| www婷婷av久久久影片| 久久久精品亚洲| 亚洲一区二区三区sesese| 欧美在线一区二区视频| 国产精品自拍偷拍| www.日韩不卡电影av| 久久久成人的性感天堂| 超碰91人人草人人干| 亚洲一区二区三区色| 日韩伦理一区二区三区av在线| 黄色一级视频片| 成人国产一区二区三区| 91精品国产99| 久久久av一区| 中文字幕在线观看一区二区三区| 日韩在线三区| 精品欧美一区二区在线观看视频| 国产亚洲精品网站| 国产精品99免视看9| 国产精品无码人妻一区二区在线| 美日韩精品免费观看视频| 天天干天天操天天干天天操| 欧美成人综合一区| 成人a在线视频| 久久久久久久久一区| 国产精品极品美女粉嫩高清在线| 亚洲综合在线中文字幕| 色香蕉在线观看| 蜜桃免费区二区三区| 91久久中文字幕| 精品国偷自产在线视频| 一本一生久久a久久精品综合蜜| 色999日韩自偷自拍美女| 海角国产乱辈乱精品视频| 99www免费人成精品| 日本一区二区高清视频| 欧美久久综合性欧美| 国产激情视频一区| 亚洲精品偷拍视频| 国产精品一区二区欧美| 国产精品第10页| 欧美日韩一区综合| 国产成人一区三区| 亚洲一区二区三区在线视频| 国产日韩精品在线播放| 久久激情五月丁香伊人| 日韩欧美国产免费| 久久99影院| 午夜精品美女自拍福到在线| av中文字幕av| 欧美激情一级欧美精品| 国产欧美日韩一区| 欧美另类第一页| 国产在线精品91| 国产精品成人播放| 精品视频一区在线|